My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
12/14/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2022 9:41:58 AM
Creation date
8/25/2022 11:03:48 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/14/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />As depicted in Table 6.16, demand can be measured quantitatively for each public facility category. <br />While the demand function for each facility consists of applying a rate to the number of facility users, <br />estimation of total demand is more complex. For concurrency management purposes, demand can be <br />divided into three types: existing, committed, and projected. Each must be considered separately for <br />purposes of concurrency management. <br />Existing Demand <br />Existing demand is simply the current level of use for a facility. For a roadway, it is the number of <br />peak hour/peak season/peak direction trips; for a school, it is the number of full-time enrolled <br />students; for water and wastewater treatment plants, it is the existing flow volume measured in <br />gallons per day. Those figures are included within applicable plan elements. <br />Existing demand then reflects the use of a facility by the current population. When compared to <br />capacity, existing demand can show if the facility has unused capacity or if it is functioning over <br />capacity. <br />Existing demand, however, is not static. As population increases and dwelling units come on-line, <br />existing demand increases. Those increases in existing demand can be identified through facility use <br />measurements. For example, regular traffic counts done on roads or treatment plant flow records are <br />examples of facility use measurements indicating existing demand levels. As existing demand levels <br />for facilities are updated, committed demand levels must be reduced if projects representing <br />committed demand have come on-line. <br />Committed Demand <br />Committed demand is a measure of the impact that approved development projects with reserved <br />capacity will have on facilities. When added to existing demand for a facility, the committed demand <br />for that facility will produce a more accurate estimate of unused capacity. That estimate of unused <br />capacity represents the amount of capacity that can realistically be allocated to new projects. <br />Committed demand must be determined by identifying all projects for which capacity has been <br />reserved through issuance of initial concurrency certificates which are still valid. Then the specific <br />facilities that will be impacted by those projects with reserved capacities must be determined; those <br />facilities will be roadways and the landfill, and they may be treatment plants, drainage conveyances, <br />and recreation facilities. Finally, the total demand on each facility attributable to committed demand <br />will be determined. <br />Applicable elements of the plan identify the rates to be applied to each project to determine facility <br />demand. Traffic volumes, for example, can be derived by applying a trip rate to the size of the <br />project. Sanitary sewer and potable water both have rates of 250 gallons per day per equivalent <br />Community Development Department <br />Adopted December _ 2021, Ordinance 2021 - <br />Indian River County <br />41 <br />172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.