My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
12/14/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2022 9:41:58 AM
Creation date
8/25/2022 11:03:48 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/14/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />Objective 3: Maintenance of Established Level -of -Service Standards <br />Through 2030, adopted levels -of -service will be maintained for all concurrency facilities. <br />Policy 3.1: The county hereby adopts the concurrency management system as described within this <br />element. The county shall maintain Land Development Regulation (LDR) Chapter 910, Concurrency <br />Management System, which implements the plan's concurrency management system. In accordance <br />with the concurrency management system of this plan and LDR Ch. 910, the county will not approve <br />any development project where the impacts of such a project would lower the existing level -of -service <br />on any facility below that facility's adopted minimum level -of -service standard. <br />Policy 3.2: The county shall approve development only in accordance with the utility connection <br />matrix identified in the Sanitary Sewer and Potable Water Sub -Elements. <br />Policy 3.3: The county shall, concurrent with the impact of new development, provide the <br />infrastructure necessary to maintain the levels -of -service identified in the various elements of the <br />Comprehensive Plan. Where development is proposed and is consistent with all applicable <br />regulations but one or more public facilities is/are operating at an inadequate service level, the <br />applicant may at his expense make facility improvements to increase facility capacity when such <br />improvements are consistent with county plans and receive county approval. <br />Policy 3.4: The county shall make land use decisions based on the planned availability of facilities to <br />maintain adopted level -of -service standards. <br />Policy .5: The county hereby adopts Concurrency Management level -of -service standards for public <br />facilities that are established in the other Comprehensive Plan Elements and which are stated below: <br />➢ Stormwater Mana eg ment: <br />The county hereby adopts the following level -of -service standard for all new drainage systems within <br />the unincorporated county: <br />➢ New development requiring major site plan approval or subdivision platting shall <br />construct a complete drainage system to mitigate the impacts of a 25 year/24 hour <br />design rainfall event using the soil conservation service type 2 modified rainfall <br />curves. <br />➢ Post development runoff for any drainage basin shall not exceed pre -development <br />runoff unless a maximum discharge rate has been adopted and the discharge does not <br />exceed that rate. If a maximum discharge rate has not been adopted for a basin, post <br />development discharge may not exceed pre -development discharge. <br />Community Development Department <br />Adopted December _ 2021, Ordinance 2021 - <br />Indian River County <br />50 <br />181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.