My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
12/14/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2022 9:41:58 AM
Creation date
8/25/2022 11:03:48 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/14/2021
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />In addition, a great portion of the plan monitoring will be in conjunction with the concurrency <br />management system which is designed to ensure that approved level -of -service standards are <br />maintained and that sufficient capacity exists in the various services and facilities. Other evaluation <br />of the plan or plan elements is likely to occur in the day to day application of the mandated <br />regulations, which will result in plan amendments. <br />The formal Evaluation and Appraisal Report required by law is currently providing and in subsequent <br />versions will provide a complete review of the plan and be conducted in compliance with the public <br />participation procedures adopted for the development of this plan. <br />As part of the monitoring system, all appropriate baseline data is currently being updated and will be <br />updated. Besides assessing progress, the evaluation and appraisal process is and will also be used to <br />determine whether the objectives should be modified or expanded. In this way the monitoring and <br />evaluation of the Comprehensive Plan Elements not only provides a means of determining the degree <br />of success of the plan's implementation; it also provides a mechanism for evaluating needed changes <br />to the plan element. <br />C:\Users\jstoll\Desktop\CIE Update\2021\2020 CIE for Strikethrough.doc <br />Community Development Department <br />Adopted December 1` 2020, Ordinance 2020-018 <br />Indian River County 60 <br />191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.