My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
05/10/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 12:25:54 PM
Creation date
8/25/2022 12:13:16 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/10/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y6 <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard D. Szpyrka, P.E., Public Works Director <br />FROM: James W. Ennis, P.E., Asst. Public Works Director <br />SUBJECT: Work Order No. 49 - Kimley-Horn and Associates, Inc. <br />Indian River Boulevard Pedestrian and Bicycle Access Improvement Project <br />(IRC -1817) <br />DATE: April 22, 2022 <br />DESCRIPTION AND CONDITIONS <br />On April 17, 2018, the Board of County Commissioners approved the Continuing Consulting Engineering <br />Service Agreement for Professional Services with Kimley-Horn and Associates, Inc. <br />In March of 2019, the Indian River County Public Works Department applied to the Florida Department <br />of Transportation (FDOT) for Small County Outreach Program (SCOP) grant funding to make roadway <br />and pedestrian improvements to the Indian River Boulevard Corridor from the 17th Street Bridge south <br />to US -1. Staff had determined that this section of roadway lacked adequate interconnected pedestrian <br />and bicycle facilities. FDOT approved the addition of the proposed project to the SCOP 5 -year funding <br />plan. <br />The purpose of Work Order No. 49 is to provide geotechnical, sidewalk, drainage and roadway design <br />and permitting services for the proposed roadway & pedestrian improvements to be made to the Indian <br />River Boulevard Corridor from the 17th Street Bridge south to US -1. The improvements include five-foot <br />bike lanes, design and installation of missing sidewalk segments to provide pedestrian continuity, milling <br />and resurfacing of Indian River Boulevard, pedestrian signalization and ADA improvements. These design <br />plans are necessary to meet the project schedule and help ensure that SCOP grant funds are still <br />obtainable to pay for a portion of the construction of this project in FY 2024. <br />Work Order No. 49 is for a total lump sum amount of $268,780. <br />FUNDING <br />Funding in the amount of $268,780 for Work Order No. 49 is available in Account No. 10921441-066510- <br />21021/Secondary Roads/IR Blvd Ped & Bike Access. <br />Account Name I <br />Account Number <br />Amount <br />Secondary Roads/IR Blvd Ped & Bike Access 1 <br />10921441-066510-21021 <br />$268,780 <br />RECOMMENDATION <br />Staff recommends approval of Work Order No. 49 to Kimley-Horn and Associates, Inc., authorizing the <br />professional services as outlined in the Scope of Services and requests the Board authorize the Chairm$0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.