My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/14/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
06/14/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 12:58:42 PM
Creation date
8/25/2022 12:36:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/14/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alt Form 525-010-6OeB STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OB <br />STATE -FUNDED GRANT AGREEMENT PROGRAM <br />MANAGEMENT <br />8/21 <br />Page 1 of 1 <br />EXHIBIT B <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: <br />FINANCIAL PROJECT NUMBER: <br />INDIAN RIVER COUNTY <br />438074-1-54-01 <br />1801 27TH STREET <br />VERO BEACH, FL 32960 <br />MAXIMUM PARTICIPATION <br />PHASE OF WORK by Fiscal Year: <br />TOTAL PROJECT FUNDS <br />) <br />LOCALFUNDS <br />STATE F <br />FUNDS <br />Indicate source of <br />Local funds <br />Design- Phase 34 Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 44Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction -Phase 54 Maximum Department Participation $1,797,126.83 <br />$977,479.83 <br />$819,647.00 <br />In -Kind <br />FY:2021 (SMALL COUNTY OUTREACH PROGRAM) <br />® Cash <br />FY: 2022 Maximum Department Participation $771,126.67 <br />$129,101.67 <br />$642,025.00 <br />❑ In -Kind <br />(SMALL COUNTY OUTREACH PROGRAM) <br />® Cash <br />Total Construction Cost $2,568,253.50 <br />$1,106,581.50 <br />$1,461,672.00 <br />Construction Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />Engineering and (Insert Program Name) <br />❑ Cash <br />Inspection - Phase 64 <br />FY: <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Engineering and Inspection Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />(Phase: ) Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />% <br />TOTAL COST OF THE PROJECT $2,568,253.50 <br />$1,106,581.50 <br />$1,461,672.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Susan Dale <br />District Grant Manager Name <br />Signature Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.