Laserfiche WebLink
40 <br />s <br />t <br />SEMINOLE SHORES <br />ST. CHRISTOPHER HARBOR <br />CONTRACT C-110 SEC. "D" <br />WASTEWATER ASSESSMRNT ROT,L <br />Construction -_ - .: <br />$71,425.00 <br />Engineering 10.9% <br />$ <br />7,785.33 <br />Assessment Roll <br />$ <br />400.00 <br />Field Inspection 4.0% <br />$ <br />2,857.00 <br />Field Staking & Testing 2.5% <br />$ <br />1,785.63 <br />Contingencies lo% <br />$ <br />7,142.50 <br />TOTAL: <br />$91,395.46 <br />Assessment/Lot <br />(Based on 35 Lot Connections) <br />$ <br />2,611.30 <br />Credit/Lot on 8" F.M. oversize <br />in lieu of 4" F.M. oversize <br />to.The_Moorings discharge;_ <br />(109.03) <br />Charge/Lot for oversize F.M. <br />to Vero Beach <br />190.00 <br />TOTAL ASSESSMENT PER LOT: <br />y <br />9 <br />l .. <br />$ <br />2,692,27 <br />