My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/1995
CBCC
>
Meetings
>
1990's
>
1995
>
12/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:13 PM
Creation date
6/16/2015 3:18:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the above -referenced project. Construction of the project has been <br />completed. Customer connections have begun, and we request the <br />Board of County Commissioners' approval of the final assessment <br />roll. (See attached minutes and Resolution IV.) <br />On October 4,• 1994, the Board of County Commissioners approved <br />Resolution III, No. 94-126, for the preliminary assessment roll on <br />ANALYSIS <br />At the October 4, 1994 public hearing, the total estimated project <br />cost of $1,945,240.46 was approved by the Board of County <br />Commissioners, subject to square footage reductions of two (2) non - <br />platted parcels. The estimated preliminary assessment was <br />$1,882,795.46, with an estimated assessment cost of $0.152621 per <br />square foot. The total final project cost is $1,673,986.27, less <br />a non -assessed cost of $114,102.16, for a final assessment of <br />$1,559,884.11, which equates to a final cost of $0.128454 (rounded) <br />per square foot of property assessed. (See attached.) The final <br />assessment is $0.024167 per square foot less than the preliminary <br />assessment. <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the adoption of Resolution <br />IV, which is attached. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Eggert, the Board unanimously adopted <br />Resolution 95-155 certifying "As -Built" costs for <br />installation of water service in the Phase V Water <br />Main Extension Growth Plan and such other <br />construction necessitated by such project. <br />As Built (Final Reso.) <br />RESOLUTION NO. 95- 15 5 <br />A RESOLUTION OF INDIAN RIVER COUNTY, FLORIDA, <br />CERTIFYING "AS -BUILT" COSTS FOR INSTALLATION OF <br />WATER SERVICE IN THE PHASE V WATER MAIN EXTENSION <br />GROWTH PLAN AND SUCH OTHER CONSTRUCTION NECESSITATED <br />BY SUCH PROJECTI PROVIDING FOR FORMAL COMPLETION <br />DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND <br />INTEREST. <br />WHEREAS, the Board of County Commissioners of Indian River County <br />determined that water improvements for properties located within the <br />area of the Phase V Water Main Extension Growth Plan are necessary to <br />promote the public welfare of the county; and <br />WHEREAS, on Tuesday, October 4, 1994, the Board held a public <br />hearing at which time and place the owners of property to be assessed _ <br />appeared before the Board to be heard as to the propriety and advis- <br />ability of making such improvements; and <br />DECEMBER 12, 1995 25 Boa 96 pAu 766 <br />
The URL can be used to link to this page
Your browser does not support the video tag.