My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-149
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 11:15:44 AM
Creation date
8/30/2022 11:14:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2022
Control Number
2022-149
Agenda Item Number
8.Y.
Entity Name
Atkins, North America, Inc.
Subject
CCNA2018 Work Order 7 for Conceptual design of Stormwater Pond/Treatment Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ardaman & Associates, Inc. EXHIBIT C <br />Geotechnical, Environmental and <br />Materials Consultants <br />April 5, 2022 <br />Proposal File No. 2223-067 <br />Revised June 10, 2022 <br />Atkins <br />482 S. Keller Road <br />Orlando, Florida 32810 <br />Attention: Mr. Chris Thompson, PE <br />Subject: Proposal for Subsurface Soil Exploration and <br />Groundwater Sampling and Testing <br />Proposed Stormwater Detention Pond <br />8th Street <br />Vero Beach, Florida <br />Dear Mr. Thompson: <br />As requested, we are pleased to present this proposal for conducting a subsurface soil exploration <br />and groundwater sampling and testing for the subject project. Based on our review of information <br />provided by Mr. Thompson, the proposed construction consists of a stormwater detention pond <br />that will encompass most of the site. Additionally, a pump station slab on grade will be constructed <br />adjacent to the pond. <br />Grading plans are not complete at this time; therefore, we have assumed that approximately 1 to <br />2 feet of fill is required to raise the pump station slab area to final elevation. Typical loading <br />conditions for the slab on grade are assumed to be less than 150 pounds per square foot. <br />The scope of our work will include determining if the soil characteristics are suitable to construct <br />the proposed pump station slab. Additionally, we will explore the subsurface conditions and <br />perform requested groundwater sampling and testing within the proposed pond area. The <br />following summarizes our proposed scope of work and associated fees for conducting the subject <br />exploration. <br />FIELD EXPLORATION <br />Since the site is heavily wooded, minor brush mowing may be performed to provide access to the <br />boring locations. We could direct a site work contractor to mow minimal paths to our boring <br />locations. Assistance from the client will be needed to help identify wetland areas and areas of <br />threatened and/or endangered species habitat which should be avoided when performing these <br />minor brush mowing operations. Also, this proposal assumes that permission from local Code <br />Enforcement, SJRWMD or other pertinent agencies for the minor mowing, if necessary, has been <br />obtained by the client. One day of brush mowing is included in this proposal. <br />1300 N. Cocoa Boulevard, Cocoa, FL 32922 Phone (321) 632-2503 FAX (321) 636-4657 <br />Louisiana: Baton Rouge, Monroe, New Orleans, Shreveport <br />Florida: Bartow, Cocoa, Fort Myers, Miami, Orlando, Port St. Lucie, Sarasota, Tallahassee, Tampa, West Palm Beach <br />
The URL can be used to link to this page
Your browser does not support the video tag.