Laserfiche WebLink
FXHIRIT "A" <br />AMENDMENT NUMBER 2 CCNA2018 WORK ORDER NUMBER 10 <br />NORTH COUNTY SEWER & WATER SYSTEM — PHASE TWO <br />PRIVATE PROPERTY BIDDING PLANS PREPARATION <br />GENERAL INFORMATION <br />The purpose of this Amendment Number 2 to Work Order Number 10 is to authorize Masteller & Moler, <br />Inc. to revise Contract Private Property Water & Sewer Design Plan Sheets for this project per County <br />Utilities' request. <br />A brief description of the scope of services and deliverables for this Amendment 2 is provided as follows: <br />SCOPE OF SERVICES <br />Based on the County Utilities' request, Masteller & Moler Inc. will provide engineering services to revise <br />the Contract Private Property Water & Sewer Design Plan Sheets for approximately 200 private property <br />parcels. The purpose is to remove the private -side potable water pipe, fixtures, and other related <br />appurtenances. These plans will be for the County's use in seeking qualifications from reputable plumbing <br />contractors for the private -side installation of the sanitary sewer system only. Consultant will provide an <br />updated quantities take -off. <br />Deliverables — The ENGINEER shall provide the COUNTY: <br />• Revised Contract Plan Sheets for the 1 Hard Copy Set & 1 Electronic <br />Private Property Water & Sewer Connections <br />TIME SCHEDULE <br />The estimated time frame for completion of <br />Revised Contract Plans (after County <br />Written Approval of this Amendment): 14 Calendar Days <br />FEE SCHEDULE <br />Masteller & Moler, Inc. proposes to provide the outlined Scope of Services based on the lump sum fees <br />of $ 5,180.00 <br />File#1422-3 Exhibit "A" - 1 <br />(1422-3_S2S-Ph2-W010-Amend02_22-0629.docx) <br />