Laserfiche WebLink
40 <br />i <br />Study and Report" covered a contiguous study area generally <br />! bordered by the Sebastian River to the north, the FEC <br />Railroad to the west, and the Pelican Pointe and Village of <br />Lake Dolores development projects to the south. <br />Finally, the project was once again expanded south to <br />Hobart Road due to the most recent subregional treatment <br />plant site strategy by the County Utilities Department and <br />expanded to the west in the Sebastian Area due to continued <br />interest by potential sewer users. This May, 1987 "North <br />County Subregional Sewer Feasibility Study and Report" shows <br />and describes the proposed sewer project which now covers a <br />total project service area in excessof 4800 acres. The <br />project service area is shown on seven (7) 24" x 36" aerial <br />photograph "Exhibits" and is generally bound by the Sebastian <br />River on the north, Indian River on the east and Hobart Road <br />on the south. The western boundary is irregular and includes <br />the Kashi Ranch; the edge of .Sebastian Highlands; the Route <br />#512 corridor west to the Chesser Gap parcel; the edge of <br />Sebastian Highlands again; and the FEC Railroad. The <br />"Exhibits" also show the location of property parcel numbers, <br />conceptual layout and pipe sizes of the proposed arterial <br />"core" sewer system; dashed lines which depict general sewer <br />subshed drainage areas; and estimated sewage amounts expected <br />at various points along the proposed system. <br />-2- <br />