Laserfiche WebLink
I <br />i. 14. Village Lake Dolores <br />15. K.O.A. Campground <br />16. Wabasso M.H.P. <br />17. Palm Paradise Park <br />18. Pelican Pointe <br />19. River Run <br />+ Reflections <br />*Has no package plant - pumps to GDU plant <br />In order to protect the environment, any sewer project <br />should strive to eliminate as many of these nineteen (19) <br />package plants as possible. In addition, the objective of <br />eliminating environmental pollution would dictate that public <br />sewer. serve the areas along Riverside Avenue in order to <br />eliminate septic sewage from ultimately discharging into the <br />Indian River. <br />Finally, in line with the objective that a proposed <br />wastewater collection system be designed as inexpensively as <br />possible with respect to its construction, the conceptual <br />design of the system will minimize crossings of the FEC <br />Railroad and U.S. Highway S1. The conceptual engineering <br />design will reflect an attempt to balance the minimum number <br />of pumping stations and force mains to serve the maximum <br />amount of service area. <br />-12- <br />