Laserfiche WebLink
• .VERO BEACH MUNICIPAL ELECTRIC SYSTEM <br />POWER COST ADJUSTMENT CLAUSE <br />PCA <br />(Continued from Sheet No. 18.0) <br />ORIGINAL SHEET NO. 18.1 <br />3. Sm = Total kWh at the generation level corresponding to the currept <br />four-month billing period estimated as the sum of generation <br />less interchange sales plus purchases. <br />4. L 9 Estimated System Losses. <br />5. T = Any applicable taxes. <br />Commencing October 1, 1987, for each month during the four-month <br />periods thereafter, the PCA shall be determined on a projected four-month <br />period and shall be fixed for each projected four-month period if, in the <br />sole opinion of the City, the projected PCA represents a reasonable estimate <br />of actual costs. If significant circumstances arise which warrant a change <br />to the PCA, then the PCA may be modified during the four-month billing cycle <br />if approved by the City. <br />Issued By: John V. Little Effective: October 1, 1987 <br />City Manager/Director of Utilities <br />