My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-035
CBCC
>
Resolutions
>
1980'S
>
1988
>
1988-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2022 10:49:28 AM
Creation date
9/2/2022 10:33:40 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1988-035
Approved Date
05/17/1988
Subject
Franchise Agreement with ELL-CAP 32 - VERO BEACH (know as ELL-CAP 32-VERO BEACH SYSTEM FRANCHISE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II® <br />(I0 <br />;1110 <br />SECTION VI <br />CERTIFICATE OF COMPi I NCE <br />A. The Utility shall render efficient service in accordance <br />with the rules and regulations as are or may be set forth by <br />the DER and the County from time to time, which shall <br />include "Construction Specification Water Treatment/ <br />Distribution and Sewage Treatment/Collection Facilities" <br />promulgated by Indian River County Utilities Department, <br />July 1980, as amended. Before issuing a construction permit <br />the Utility,s project engineers shall certify to the County <br />that the requisite design standards will be met by <br />completion of the project. The Utility shall submit this <br />certification to the County for review along with the DER <br />applications and plans. Submission to the County may occur <br />simultaneously with submission to the DER. Upon approval by <br />the County of the plant and system a construction permit may <br />be issued to the Utility. <br />B. Upon the completion of all construction of the Utility, <br />the project engineer for the Utility shall certify, under <br />seal, that the system has been constructed substantially in <br />accordance with the plans and specifications previously <br />approved and that the systems meet all of the standards <br />required by the County. The certification shall include <br />submission to the County of two sets of "as -built" (as <br />defined by the County) drawings, consisting of one set in <br />reproducible vellums and one set of regular blueline prints; <br />and that the systems meet all of the standards required by <br />the County, including pressure and leakage tests, <br />chlorination and bacteriological tests, and infiltration and <br />exfiltration tests. No service is to be provided to <br />customers until such time as the County issues an operating <br />permit. The Utility shall grant necessary easements to the <br />County without charge to connect the Utility to the County <br />System. The Utility agrees to pay all other fees which may <br />be applicable during the operation of the system. <br />SECTION VII <br />CERTIFICATION OF OPERATIONS AND MAINTENANCE <br />A. The operation and maintenance of the Utility shall at all <br />times be not inferior to the quality standards for public <br />water distribution and public sewage collection and other <br />rules, regulations, and standards now or hereafter adopted <br />by the DER, or other goveri.mental body having jurisdiction, <br />including Indian River County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.