My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-153A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-153A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 11:45:34 AM
Creation date
9/9/2022 11:45:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/16/2022
Control Number
2022-153A
Agenda Item Number
8.AI.
Entity Name
TLC Diversified, Inc.
Subject
Change Order for South County Reverse Osmosis Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />DATE OF ISSUANCE: July 20, 2022 EFFECTIVE DATE: <br />OWNER: Indian River County <br />OWNER's Contract No.: 2021026 <br />No. 1 <br />Project No.: 044572102 <br />CONTRACTOR: TLC Diversified, Inc ENGINEER: Kimley-Horn & Associates, Inc. <br />You are directed to make the following changes in the Contract Documents: <br />Description: This change order instructs the Contractor to furnish/install the following for the lump sum of <br />$483,563.83: <br />1. Replacement switchboard and replacement raw water blend assembly <br />Reason for change order: Necessity to maintain plant operation. Failure of existing equipment <br />Attachments: Quotations, Cover Letter <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times: <br />$ 10,665,515.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Net changes from previous Change Orders <br />Net change from previous Change Orders: <br />No. to No. <br />No. to No. <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 10,665,515.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ 483,563.83 <br />0 days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ 11,149,079.48 <br />Substantial Completion: 760 <br />Ready for finpl-e4ym, 820 <br />ays or a es <br />RECO E ED: APP pp ' ' � PTM- <br />By./, fi��>•IGE�, New By: <br />Cyd \r; <br />Engineer (Authorized Signature) Owner (Authorized Signatta"> ,. Cp ra�'(f <br />Date: <br />%7-17-1v <br />Date: 08/28/2022 <br />/� --Date: % 2 • <br />Signature) <br />EJCDC No. C-700 (2002 Edition) AP,PRr��, r,� AS TO F0RN! <br />Prepared by the Engineers Joint Contracl�.Qp_cuMrdq&oMrnN#0W dorsed by The Associated <br />General Contractors of America. Attest: Jeffrey R. Smith, Clerk of <br />008 Circuit Court and Comptroller <br />BY <br />0001 NTY Ali-TGt Nr,7-.Y er. —11N"1A11M,( Ln <br />Deputy <br />
The URL can be used to link to this page
Your browser does not support the video tag.