My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N�FRc <br />Indian River County Purchasing Division <br />purchasing@ircgov.com <br />ADDENDUM NO. 1 <br />Issue Date: May 16, 2022 <br />Indian River Blvd Resurfacing from 53rd St to Barber Bridge <br />Project Name: (IRC -1707) <br />Bid Number: 2022046 <br />Bid Opening Date: May 26, 2022 <br />This addendum is being released to answer questions received to date, provide the minutes from the Pre - <br />Bid meeting, and modify the bid documents. The information and documents contained in this <br />addendum are hereby incorporated in the invitation to bid. This addendum must be acknowledged <br />where indicated on the bid form, or the bid may be declared non-responsive. <br />Attachments within this odf <br />Itemized Bid Schedule — Addendum 1 <br />Plan Sheet 3 — Addendum 1 <br />Plan Sheet 9 — Addendum 1 <br />Pre -Bid Meeting Minutes <br />Pre -Bid Meeting Sign In Sheet <br />Attached separately: <br />Itemized Bid Schedule — Addendum 1 as an excel document <br />Design CAD Files <br />Survey CAD Files <br />Questions and Answers <br />1. Is the bid form available in excel format for contractors to use? The updated bid form is provided in <br />excel. <br />2. Would the engineer provide the geometry for the baseline? This information is shown on the plan <br />sheets, but portions of it are overwritten and illegible. See attached <br />3. Sheet 3 of 51 shows a widening detail consisting of Base Group 6. How will this work be paid? We <br />have a pay item for Optional Base Group 11. Plan Sheet 9 - Addendum 1 shows the corrected <br />quantities for Optional Base Group 11 and an added pay -item and quantity for Optional Base <br />Group 6. <br />4. Would the engineer provide cross sections? The embankment work was billed as a lump sum pay - <br />item for minor dressing to harmonize the shoulder in the widening areas to 6:1 and 4:1 slope, <br />respectively. This is meant to tie the new shoulder back to the existing grades. <br />Are CAD files available for use during bidding? See attached <br />
The URL can be used to link to this page
Your browser does not support the video tag.