My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00550 — Notice to Proceed <br />Dated <br />TO: <br />(BIDDER) <br />ADDRESS: <br />Contract For: <br />INDIAN RIVER BOULEVARD RESURFACING FROM <br />53RD STREET TO THE MERRILL BARBER BRIDGE <br />Project No: IRC -1707 <br />FM No: 441919-1-54-01 <br />IRC Bid No. 2022046 <br />You are notified that the Contract Times under the above contract will commence to run on <br />. By that date, you are to start performing your obligations under the Contract Documents. <br />The contract has allocated 180 calendar days for Substantial Completion of this project and 210 <br />calendar days for Final Completion. In accordance with Article 4 of the Agreement the date of <br />Substantial Completion is and the date of readiness for final payment is <br />CONTRACTOR shall not commence work under this Contract until he has obtained all insurance <br />required under Article 5 and such insurance has been delivered to the OWNER and approved by <br />the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his <br />subcontract until all similar insurance required of the Subcontractor has been so obtained and <br />approved. All such insurance shall remain in effect until final payment and at all times thereafter <br />when CONTRACTOR may be correcting, removing or replacing defective Work in accordance <br />with Article 13. <br />Also, before you may start any Work at the Site, you must: <br />(add other requirements, if applicable) <br />INDIAN RIVER COUNTY <br />(OWNER) <br />By: <br />(AUTHORIZED SIGNATURE) <br />(TITLE) <br />Notice to Proceed REV 04-07 00550 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid Documents\DIV 0_1_Bid and <br />Contract Doc IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.