Laserfiche WebLink
4. All equipment and systems have been tested in the presence of the ENGINEER or <br />his representative and are fully operational with no defects or deficiencies except as <br />listed below. <br />5. The Work is complete and ready for final acceptance by the OWNER. <br />6. CONTRACTOR hereby certifies that it has no claims against the OWNER. <br />(Contractor) <br />LIM <br />STATE OF <br />COUNTY OF <br />(Corporate Seal) <br />Sworn to (or affirmed) and subscribed before me by means of ❑ physical presence or ❑ <br />online notarization, this day of 20 , by <br />(name of person making statement). <br />(Signature of Notary Public - State of Florida) <br />(Print, Type, or Stamp Commissioned Name of Notary Public) <br />❑ who is personally known to me or ❑ who has produced <br />as identification. <br />+ + END OF SECTION + + <br />Contractor's Final Certification of the Work - 00632-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid Documents\DIV <br />0 1 Bid and Contract Doc IRC-1707.docx <br />