My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees that <br />title to all Work, materials, and equipment covered by <br />any Application for Payment, whether incorporated in <br />the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the status <br />of completion. If ENGINEER does not consider the <br />Work substantially complete, ENGINEER will notify <br />CONTRACTOR in writing giving the reasons therefore. <br />If ENGINEER r siders the Work substantially GOM <br />lete, ENGIN ER will prepare and .deliver to GIANER <br />;terns tebt-9 GGmpleted-)r GorreGted befeFe fin -al <br />payment 01,A,a ER, shall have seven days after Pere' + <br />of thA <br />0bj9Gtlan +a ENGINEER as +a aRY sans Of the <br />objesKans ENGINEER ^ RGlu de that the Wark 's + <br />�hstan+ially GGFnnle+e-ENGIAIEFER Will ��'th'n 1A rl vs <br />- - in 1 , days- <br />afters hmissinn of +he UnintAfivprertif'r a+e +A 01AINER <br />therefor. If, after Gensidel;atie.nr—sf /nlFER's <br />ehie^+ians ENIGINIFEER rnns'rdem the Work ..,,hstan <br />tially GGIMPlete,, ENGINEER ,.;u Wthin raid 14 days <br />revised tentative list of items +a be ^ I + ra <br />GGrreGterd) refler+in^ s IGh Ghannes from the tentative <br />6ertlfi6ate ENGINEER believes justified aft r <br />Gonsidnratiern sf snob}estiens frern 9WN€;e <br />R. At +� <br />time of deliveFy of the to +a+ : e rort ffnate ff Substa+ +' I+' I <br />('amnle+inn ENGINEER ..ill deliver +e OWNER and <br />dig of 'hili+' di f' I + <br />�. �.,,.,.� � v r evponi�iv�'rsiev�i^c-inirn�-rrrtar-pay-n�cns <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of the <br />Work, may be accomplished prior to Substantial Com- <br />pletion of all the Work subject to the following condi- <br />tions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the Work. <br />CONTRACTOR at any time may notify OWNER <br />and ENGINEER in writing that CONTRACTOR <br />considers any such part of the Work ready for its <br />intended use and substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the Work. <br />Within a reasonable time after either such <br />request, OWNER, CONTRACTOR, and <br />ENGINEER shall make an inspection of that <br />part of the Work to determine its status of <br />completion. If ENGINEER does not consider <br />that part of the Work to be substantially com- <br />plete, ENGINEER will notify OWNER and <br />CONTRACTOR in writing giving the reasons <br />therefor. If ENGINEER considers that part of <br />the Work to be substantially complete, the <br />provisions of paragraph 14.04 will apply with <br />respect to certification of Substantial Com- <br />pletion of that part of the Work and the division <br />General Conditions - 00700 - 34 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid Documents\DIV <br />0 2 Section 700 IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.