My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE OF ISSUANCE: <br />OWNER: <br />CONTRACTOR <br />Project: <br />OWNER's Project No <br />FM No.: <br />SECTION 00948 - Work Change Directive <br />EFFECTIVE DATE: <br />Indian River County <br />IRC -1707 <br />No. <br />INDIAN RIVER BOULEVARD RESURFACING FROM 53`d STREET TO THE MERRILL <br />BARBER BRIDGE <br />IRC -1707 OWNER'S Bid No. 2022046 <br />441919-1-54-01 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Reason for Change Order: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />Unit Prices <br />❑ Lump Sum <br />❑ Other: <br />By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />II Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />Date: <br />** END OF SECTION** <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />Work Change Directive — 00948 <br />FAPublic Works\ENGINEER ING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 0 4 Forms IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.