My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1707 <br />SECTION 01310 - CONSTRUCTION SCHEDULES <br />1.1 GENERAL REQUIREMENTS <br />A. No partial payments shall be approved by the ENGINEER until there is an approved <br />construction progress schedule on hand. <br />B. Designate an authorized representative who shall be responsible for development and <br />maintenance of the schedule and of all progress and payment reports. This <br />representative shall have direct project control and complete authority to act on behalf <br />of the CONTRACTOR in fulfilling the commitments of the CONTRACTOR's schedules. <br />1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br />When the ENGINEER requires the CONTRACTOR to submit revised (updated) progress <br />schedules on a monthly basis the CONTRACTOR shall: <br />A. Indicate the progress of each activity to the date of submission. <br />B. Show changes occurring since the previous submission listing: <br />1. Major changes in scope. <br />2. Activities modified since the previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended and its effect. <br />3. The effect of changes on schedules of other prime contractors. <br />1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br />On or before the tenth day after the effective date of the Agreement, submit the initial <br />schedules to the ENGINEER. The ENGINEER will review the schedules and return a <br />review copy to the CONTRACTOR within 21 days after receipt. If required by the <br />ENGINEER, resubmit revised schedules on or before the seventh day after receipt of the <br />review copy. If required by the ENGINEER, submit revised monthly progress schedules <br />with that month's application for payment. <br />Construction Schedules - 01310-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 1 GENERAL REQUIREMENTS - IRC-1707.docx <br />