My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -1707 <br />SECTION 01520 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />1.1 SCOPE <br />A. Provide all construction equipment and facilities and temporary controls required <br />to satisfactorily complete the work represented on the Drawings and described in <br />the Specifications. <br />1.2 RESPONSIBILITY <br />A. All construction facilities and temporary controls remain the property of the <br />Contractor establishing them and shall be maintained in a safe and useful <br />condition until removed from the construction site. <br />B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, sheeting, <br />forms, barricades, drains, flumes, and the like, any of which may be needed in <br />construction of any part of the work and which are not herein described or <br />specified in detail, must be furnished, maintained and removed by the <br />CONTRACTOR, who is responsible for the safety and efficiency of such work and <br />for any damage that may result from their failure or from their improper <br />construction, maintenance or operation. <br />C. In accepting the Contract, the CONTRACTOR assumes full responsibility for the <br />sufficiency and safety of all hoists, cranes, temporary structures or work and for <br />any damage which may result from their failure or their improper construction, <br />maintenance or operation and will indemnify and save harmless the OWNER and <br />ENGINEER from all claims, suits or actions and damages or costs of every <br />description arising by reason of failure to comply with the above provision. <br />1.3 TEMPORARY UTILITIES AND SERVICES <br />A. TEMPORARY WATER <br />1. Provide a temporary water service as required for all construction <br />purposes and pay for all water used. <br />2. Furnish potable drinking water in suitable dispensers and with cups for <br />use of all employees at the job. <br />3. Provide all temporary piping, hoses, etc., required to transport water to <br />the point of usage by all trades. <br />4. When temporary water service is no longer required, remove all <br />temporary water lines. <br />Construction Facilities and Temporary Controls - 01520-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\t-Admin\Bid Documents\Bid <br />Documents\DIV1 GENERAL REQUIREMENTS -IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.