My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1707 <br />SECTION 01710 - SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />Furnish all labor, equipment, appliances, and materials required or necessary to clean up <br />and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work and the adjacent areas affected <br />thereby in a neat and orderly condition. Remove all rubbish, surplus materials, <br />and unused construction equipment. Repair all damage so that the public and <br />property owners will be inconvenienced as little as possible. <br />B. Provide onsite containers for the collection of waste materials, debris, and rubbish <br />and empty such containers in a legal manner when they become full. <br />C. Where material or debris has been deposited in watercourses, ditches, gutters, <br />drains, or catch -basins as a result of the CONTRACTOR's operations, such material <br />or debris shall be entirely removed and satisfactorily disposed of during the <br />progress of the work, and the ditches, channels, drains, etc., shall be kept clean <br />and open at all times. <br />D. Before the completion of the project, unless otherwise especially directed or <br />permitted in writing: <br />1. Tear down and remove all temporary buildings and structures; <br />2. Remove all temporary works, tools, and machinery, or other construction <br />equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, all parts of the premises, and adjacent property affected <br />by construction operations, in a neat and satisfactory condition. <br />E. Restore or replace any public or private property damaged by construction work, <br />equipment, or employees, to a condition at least equal to that existing <br />immediately prior to the beginning of the operations. To this end, the <br />CONTRACTOR shall restore all highway, roadside, and landscaping work within any <br />right-of-way, platted or prescriptive. Acceptable materials, equipment, and <br />methods shall be used for such restoration. <br />F. Thoroughly clean all materials and equipment installed and on completion of the <br />work, deliver the facilities undamaged and in fresh and new -appearing condition. <br />G. It is the intent of the Specifications to place the responsibility on the CONTRACTOR <br />to restore to their original condition all items disturbed, destroyed, or damaged <br />during construction. Particular attention will be placed on restoration of canals to <br />equal or better condition than prior to construction. <br />Site Cleanup and Restoration - 01710-1 <br />P1Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\B1d Documents\Bid <br />Documents\DIV 1 GENERAL REQUIREMENTS - IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.