Laserfiche WebLink
Division 2 - Technical Provisions, IRC -1707 <br />trimmed on all sidewalks. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 01011 — Mobilization — Per Lump Sum <br />SECTION 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists of <br />maintaining traffic within the limits of the project for the duration of the construction period, <br />including any temporary suspensions of the work. It shall include the construction and <br />maintenance of any necessary detour facilities; the providing of necessary facilities for access <br />to residences, businesses, etc., along the project; the furnishing, installing and maintaining <br />of traffic control and safety devices during construction, the control of dust through the use <br />of calcium chloride if necessary, and any other special requirements for safe and expeditious <br />movement of traffic as may be called for on the plans. The term, Maintenance of Traffic, as <br />used herein, shall include all of such facilities, devices and operations as are required for the <br />safety and convenience of the public as well as for minimizing public nuisance; all as specified <br />in this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br />Section. <br />BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall present his <br />Maintenance of Traffic Plan at or before the pre -construction conference. The Maintenance <br />of Traffic Plan shall indicate the type and location of all signs, lights, barricades, striping and <br />barriers to be used for the safe passage of pedestrians and vehicular traffic through the <br />project and for the protection of the workmen. The plan will indicate conditions and setups <br />for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, alternate <br />proposals will be considered when they are found to be equal to or better than the plan <br />specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has been <br />approved in writing by the Engineer. Modifications to the Maintenance of Traffic Plan that <br />become necessary shall also be approved in writing. Except in an emergency, no changes to <br />the approved plan will be allowed until approval to change such plan has been received. <br />Division 2 — Technical Provisions - 01025-3 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid DocumentsXDIV <br />2 TECHNICAL PROVISIONS - IRC-1707.docx <br />