Laserfiche WebLink
Division 2 -Technical Provisions, IRC -1707 <br />3. All final Elevations to be plotted on PGL AND Plan & Profile sheets as applicable. <br />4. Elevations of edge of pavement and flow line at curb inlets and on the adjacent edge of <br />pavement at curb inlets. <br />WATER, FORCE, AND RECLAIMED WATER MAINS: <br />1. Show size and type of material used to construct mains. <br />2. Show horizontal location and elevation of all tees, crosses, bends, terminal ends, <br />valves, fire hydrants, air release valves, and sampling points, etc., by distances from <br />known reference points. <br />3. Show location, size and type of material of all sleeves and casing pipes. <br />4. Elevation and horizontal location of all storm sewers, gravity sewers including <br />laterals, force mains, water mains, etc. which are crossed; including clearance <br />dimension at all conflicts or crossings. <br />5. Top of pipe elevation and horizontal location of all water and force main stub -outs. <br />6. Horizontal location of all services at the property lines. <br />7. Horizontal and vertical location of pipe including size of all mains and ground elevation <br />shall be obtained at one -hundred (100) foot intervals. Contractor shall place <br />temporary PVC stand pipes (tell -tales) at each of the one -hundred (100) foot intervals <br />and at all fittings and conflicts/crossings to facilitate the record drawing survey. The <br />tell-tale pipes shall be constructed of 2 -inch PVC pipe, shall be placed on the top of <br />the pipes to be surveyed, and shall be removed by the Contractor after completion <br />of the field survey by the "As -Built" Professional Surveyor. <br />8. Location of fire lines. <br />9. Dedicated easement locations, identified by O.R. Book and Page Number. <br />GRAVITY SEWER: <br />1. Manholes: Elevation of top rim, bottom elevation and invert of each influent and <br />effluent line. <br />2. Show distance between manholes center -to -center and horizontal location by <br />baseline station and offset. <br />3. Show material size and type used to construct sewer mains. <br />4. Show length (center of manhole to end of stub) distances from known reference <br />points or baseline offsets, and elevation of stub -outs. <br />5. Show which services have twenty (20) foot length of DIP at water main crossings. <br />6. Show station and offset location of sanitary services at property line. Particular care <br />in dimensioning needed in special situations, i.e., cul-de-sacs and locations where <br />services are not perpendicular to wye. <br />7. Show invert elevation of sanitary service at property line. <br />8. Any and all necessary dedicated easement locations, identified by O.R. Book and Page <br />Number. <br />Division 2 — Technical Provisions - 01025-26 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid Documents\DIV <br />2 TECHNICAL PROVISIONS - IRC-1707.docx <br />