My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-157G
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-157G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 12:05:02 PM
Creation date
9/13/2022 12:18:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/16/2022
Control Number
2022-157G
Agenda Item Number
12.G.1.
Entity Name
Barth Construction, Inc.
Subject
Dick Bird Park Pickleball Courts
Project Number
IRC-2204
Bid Number
2022067
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reference standard, test, or approval referred to <br />in the Contract Documents, or has been <br />damaged prior to ENGINEER's recom- <br />mendation of final payment (unless responsi- <br />bility for the protection thereof has been <br />assumed by OWNER at Substantial Completion <br />in accordance with paragraph 14.04 or 14.05). <br />D. Furnish, Install, Perform, Provide <br />1. The—were"furnish," why; Used <br />oonnestien with services, materials, 9r <br />eni . ;ent shall moon to supply and delive <br />1.6-4 eeniineo materials equipment t the <br />use or *nstall.afiep .;;nd- in usable or operable <br />sonditiGR. <br />4. When "furnish," "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context clearly <br />requiring an obligation of CONTRACTOR, <br />"provide" is implied. <br />E. Unless stated otherwise in the Contract Docu- <br />ments, words or phrases which have a well-known <br />technical or construction industry or trade meaning are <br />used in the Contract Documents in accordance with <br />such recognized meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also <br />deliver to OWNER such Bonds as CONTRACTOR <br />may be required to furnish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish to CONTRACTOR up to <br />ten copies of the Contract Documents. Additional <br />copies will be furnished upon request at the cost of <br />reproduction. <br />2.03 Commencement of Contract Times; Notice <br />to Proceed <br />A. The Contract Times will commence to run on <br />the thirtieth day after the Effective Date of the Agree- <br />ment or, if a Notice to Proceed is given, on the day <br />indicated in the Notice to Proceed. A Notice to Pro- <br />ceed may be given at any time within 30 days after the <br />Effective Date of the Agreement. In no event will the <br />Contract Times commence to run later than the <br />ninetieth day after the day of Bid opening or the thirtieth <br />day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2.04 Starting the Work <br />A. CONTRACTOR shall start to perform the <br />Work on the date when the Contract Times commence <br />to run. No Work shall be done at the Site prior to the <br />date on which the Contract Times commence to run. <br />2.05 Before Starting Construction <br />A. CONTRACTOR's Review of Contract Docu- <br />ments: Before undertaking each part of the Work, <br />CONTRACTOR shall carefully study and compare the <br />Contract Documents and check and verify pertinent <br />figures therein and all applicable field measurements. <br />CONTRACTOR shall promptly report in writing to <br />ENGINEER any conflict, error, ambiguity, or <br />discrepancy which CONTRACTOR may discover and <br />shall obtain a written interpretation or clarification from <br />ENGINEER before proceeding with any Work affected <br />thereby; however, CONTRACTOR shall not be liable <br />to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or discrepancy in the <br />Contract Documents unless CONTRACTOR knew or <br />reasonably should have known thereof. <br />B. Preliminary Schedules: Within ten days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), CONTRAC- <br />TOR shall submit to ENGINEER for its timely review: <br />1. a preliminary progress schedule <br />indicating the times (numbers of days or dates) <br />for starting and completing the various stages of <br />the Work, including any Milestones specified in <br />the Contract Documents; <br />2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub- <br />mitting, reviewing, and processing such <br />submittal; and <br />3. a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />General Conditions - 00700 - 4 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2204 Dick Bird Park -Pickle Ball Court\1-Admin\Bids\Bid Documents\DIV 0 -2 -Section 700 IRC-2204.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.