My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-157G
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-157G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 12:05:02 PM
Creation date
9/13/2022 12:18:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/16/2022
Control Number
2022-157G
Agenda Item Number
12.G.1.
Entity Name
Barth Construction, Inc.
Subject
Dick Bird Park Pickleball Courts
Project Number
IRC-2204
Bid Number
2022067
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -2204 <br />SC -5.06 Property Insurance <br />SC -5.06 Delete paragraphs GC -5.06.A, B, and C in their entirety <br />SC -5.06.E Delete paragraph GC -5.06.E in its entirety <br />SC -5.07 Waiver of Rights <br />SC -5.07 Delete GC -5.07 (paragraphs A, B, and C) in its entirety. <br />SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and B) in its entirety. <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC -5.09 (paragraph A)in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.6. Add the following paragraphs immediately after paragraph GC -6.02.8: <br />1. Regular working hours are defined as Monday through Friday, excluding Indian River <br />County Holidays, from 7 a.m. to 5 p.m. <br />2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, Good <br />Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, <br />Friday after Thanksgiving, Christmas Eve and Christmas Day. Working on these days will <br />not be permitted without prior written permission and approval from the Construction <br />Coordination Manager. <br />3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work <br />in excess of eight hours in any one calendar day or 40 hours in any one calendar week, <br />even though such overtime work may be required under emergency conditions and may <br />be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, <br />which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br />CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection <br />and testing from any payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from <br />overtime work by the CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to <br />deduct all such costs from any payments otherwise due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06. C. <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to <br />the extent practicable, information about amounts paid to CONTRACTOR on account of Work performed <br />for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. <br />Supplementary Conditions - 00800-6 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2204 Dick Bird Park - Pickle Ball Court\t-Admin\Bids\Bid Documents\DIV 0-3—section 800 IRC-2204.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.