Laserfiche WebLink
IRC -2204 <br />SECTION 00948 — Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />OWNER: <br />CONTRACTOR <br />Project: <br />OWNER's Project No. <br />FM No.: <br />EFFECTIVE DATE: <br />Indian River Cou <br />DICK BIRD PARK PICKLEBALL COURTS <br />IRC -2204 OWNER'S Bid No. 2022067 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Reason for Change Order: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />Unit Prices <br />II Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />Other: <br />By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />** END OF SECTION** <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />Work Change Directive — 00948 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2204 Dick Bird Park -Pickle Ball Court\t-Admin\Bids\Bid Documents\DIV 0_4_Forms_Template_IRC-2204.docx <br />