Laserfiche WebLink
August 1, 2022 <br />Revised August 11, 2022 <br />Revised August 17, 2022 <br />Revised August 31, 2022 <br />Via e-mail: dschryvercbircgov.com <br />David W. Schryver, P.S.M. <br />County Surveyor, Engineering Division <br />Indian River County <br />1801 27th Street (Building A) <br />Vero Beach, FL. 32960 <br />(772) 226-1386 <br />CIVILSU"& <br />� <br />A Tradition of Innovative Engineering <br />EXHIBIT A <br />RE: IRC -2214 Vero Lakes Estates Master Drainage <br />Thank you very much for your request. <br />In accordance with your request CivilSury Design Group, Inc. is pleased to provide a proposal for a Topographic Survey for the Right -of -Way <br />and rear lot swales. <br />The Topographic Survey shall adhere to the Standards of Practice as set forth by the Board of Surveyors and Mappers pursuant to Rule <br />5J-17 of the Florida Administrative Code. <br />The Topographic Survey shall depict the following: <br />Horizontal datum shall be based on the East Zone of the Florida State Plane Coordinate System. <br />1) Spot elevations at 50' intervals including intermediate highs and lows, ditches, Etc. <br />2) Spot elevations utilizing a 50' grid. <br />3) All above ground improvements limited to roadways and drainage structures and features. <br />4) Prepare the Survey in AutoCAD Civil 3D Version 2020 or newer. <br />5) Cross Section the ditch at 81 st Street and at each street intersection (approximately 9 cross sections). <br />6) Obtain centerline of swale elevations along the rear of the lots (1 Cross Section at the approximate center of each lot). <br />7) Total linear feet of the project consist of 18,500'+- along roadway and 10,500' of rear ditches. <br />I anticipate the following man hour utilization; <br />200 Hours Survey crew ($165.00) $33,000.00 <br />80 Hours Survey Tech. ($120.00) $9,600.00 <br />30 Hours P.S.M. ($180.00) $5,400.00 <br />6 Hours Director ($220.00) $1,320.00 <br />The Lump sum fee for Topographic Survey is $49,320.00 <br />Deliverables will include four (4) original signed and sealed drawings of the Topographic Survey as well as a PDF file and AutoCAD digital file. <br />Please feel free to contact me anytime if you have any questions. I anticipate this project to take eight to ten weeks to complete. <br />Sincerely, Accepted: <br />CivilSury Design Group, Inc. <br />SZftW��ck Name: <br />Director of Surveying and Mapping Date: <br />E-mail: sworack@civilsurv.com <br />www.CivilSurv.com <br />Small Business Enterprise <br />2525 Drane Field Road i Suite 7 1 Lakeland, Florida 33811 4& <br />p 863-6464771 1 f. 863-646-3378 1 toll free 866-397.4771 <br />