Laserfiche WebLink
Work Order No. 54 <br />90t1 Avenue & Oslo Road <br />Corridor Improvements <br />The Geotechnical Sub -Consultant Engineer shall perform analysis of all the data obtained to <br />evaluate subsurface conditions and develop engineering recommendations to guide site <br />preparation procedures and foundation support. <br />C. Construction Documents: <br />The Construction plan set shall consist of the following: <br />PHASE SUBMITTALS <br />60% <br />90% <br />100% <br />Cover Sheet (Location map, Project <br />Length, Engineer of Record) <br />C <br />F <br />F <br />General Notes <br />C <br />C <br />F <br />Summary of Pay Items/Quantities <br />P <br />C <br />F <br />Horizontal and Vertical Control Sheets <br />(Benchmarks, Reference Points, Section <br />C <br />C <br />F <br />Corners) <br />Details <br />P <br />C <br />F <br />Plan Sheets (40 scale) <br />C <br />C <br />F <br />Cross Sections at approximately 100 ft <br />intervals, extending 10'beyond proposed <br />right-of-way (1"=5' Vertically, <br />C <br />C <br />F <br />1"=20'Horizontally) <br />Signage & Pavement Marking Plans <br />C <br />(40 scale) Included in Plan Sheets <br />P <br />F <br />Construction Cost Estimate and <br />Quantities <br />C <br />C <br />F <br />Notes: P — Preliminary, C — Complete, but subject to change, F - Final <br />General Construction Plan Requirements: <br />2. Plans shall be prepared on 11" x 17" sheets. <br />3. Each phase submittal shall include drawings in PDF format. <br />4. Plan sheets shall depict existing right-of-way, section lines, property lines, and <br />centerline of construction. Horizontal control points with state plane <br />coordinates for all PC's, PT's, curve radius, curve length and horizontal PI's shall <br />be included on the Plan or summarized in an alignment table. <br />5. Plans shall include spot grades adequate to describe any proposed grading. <br />6. Match lines shall not be located within the limits of an intersection. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />Page 3 of 8 <br />