My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-177
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 12:08:37 PM
Creation date
10/13/2022 12:07:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/20/2022
Control Number
2022-177
Agenda Item Number
8.B.
Entity Name
Gerelcom, Inc.
Subject
Second Extension and Amendment to Agreement for Annual Telecommunication and Fiber Service
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Group 2 <br />OSP Construction Conduit, Pull and Junction Boxes <br />Per <br />Unit Price <br />— _63_0-5-12-24 <br />— Conduit, 2'_10' PVC @ 24", Machine Trench (F&I) <br />LF <br />$ <br />— _63_0-5-12-36 <br />_ _ _ _ _ _ <br />_ Conduit, 2" PVC _@ 36" _Machine Trench (F_ &I) <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ _5.60 <br />— 630-5-13-24 <br />-- <br />_ _ _ _ _ _ _ _ <br />— Conduit, 2_PVC @ 24", Hand Trench (F&I) <br />-- ---- —---------- <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ _6.80 <br />- 630-5-13-36 <br />----- <br />— Conduit, 2_PVC @ 36", Hand Trench (F&I) <br />-----------------------------—-- <br />_ _ _ ----- <br />LF_ <br />$ <br />_7.10 <br />— _63_0-5-12-ep <br />_Conduit, 2_PVC Additional Pipe In Trench (F&I) <br />LF <br />_ <br />$ <br />--9.25 <br />— _630-6-1.2_5 _ <br />_ _ _ _ _ _ _ <br />— Inn_erduct, 11/4" Corrugated, Colored (F&I) <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ _2.50 <br />1.80 <br />— 63_0-6-4_1.25 <br />_ _ _ _ _ _ _ _ <br />— Conduit_Plowing 4W1.25" HDPE, Colored (F&I)— <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ <br />10.30 <br />— — 630-6-23 — <br />_ _ _ _ _ _ _ <br />— MaxCell Placement in existing 2" Conduit - 2" - 3 Cell (F&I) <br />—Co <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ <br />3.10 <br />__6307-33 — <br />— MaxCell Placement in existing 3_' nduit_3_' - 3 Cell (F&1) <br />----------- <br />LF <br />$ <br />— _ 630-6-43 _ <br />_ _ _ <br />_ _MaxCell Placement in existing 4" Conduit - 4_' - 3 Cell (F&I) <br />_ _ _ _ <br />LF <br />_ <br />$ <br />_ _4.10 <br />— 630-6-00-18 <br />_ _ _ <br />— Cable Direct Bury, Hand Dig _@ 18" (1 Only) ------------LF--$ <br />_ _ _ _ <br />_ <br />_ _4.80 <br />5.15 <br />— _63_0-6-00-30 <br />— Cable Direct Bury, Plow @ 30" (1 Only) _ _ <br />LF <br />$ <br />— <br />7.40 <br />— 630 -6 -12 -db <br />_ _ _ _ _ _ _ _ _ <br />— Directional Bore, 2" HDPE (F&I)----------------LF-- <br />_ _ _ _ <br />_ <br />_: <br />—_63_0 -6 -14 -db <br />— Directional Bore, 2" HDPE, Special Conditions (F&I) <br />LF <br />-- 77 <br />630-6-771 <br />-7- <br />_------- <br />—Directional Bore, 8_' Under Waterway <1,000 If (F 1) <br />LF <br />$ <br />55.00 <br />630-6-12-grs <br />— -------------------------------------- <br />— — — — — <br />Conduit, 2" GRS, (F &I) <br />— — — — <br />LF <br />_ <br />$ <br />— <br />9.70 <br />- 630-6-14-grs <br />— Conduit, 4_GRS, (F&I)--------------------LF--$ <br />17.80 <br />— 630-6-12-grs <br />Conduit_ 2_ Fiberglass Bridge Mount (F&I)_ <br />LF <br />— <br />42.25 <br />— 630-6-14-grs <br />— — <br />— Conduit, 4" Fiberglass Bridge Mount (F&I)— — — <br />— — — <br />— — <br />_ _ <br />LF <br />_ <br />$ <br />48.50 <br />77 <br />7 <br />--63-0--TW <br />----------------------------------------- <br />— — — — — — <br />tect <br />Deable Tracer— Wire (F&I)— <br />— — — — — <br />LF <br />— — <br />$ <br />— — <br />0.40 <br />--630-7-MT-- <br />---- <br />Detectable Marking Tape (F&I)---------------- <br />---- — -- <br />LF <br />$ <br />0.25 <br />630-7-JL <br />Jet Line (F&I) _ _ _ <br />— --- <br />LF <br />— -- <br />630 -7 -ROW <br />-------------------------------------------- <br />ROW Delineator Marker Post Orange 6' (F&I) <br />EA <br />_ <br />$ <br />_0.20 <br />64.50 <br />Pull Boxes and Junction Boxes <br />Per <br />Unit Price <br />635-8-444 <br />Manhole, Concrete 4'x4'x4' Steel Lid (F&I) <br />EA <br />$ 3,200.00 <br />635-8-232 <br />Handhole, Composite 24"06"x24" W/ Lid (F&I) <br />EA <br />635-8-232TR <br />Handhole, Composite 24"x36"x24" W/ Lid Traffic Rated (F&I) <br />EA <br />635-8-121 <br />Pullboxes, Composite 17"x30"x12" W/ Lid (F&I) <br />EA <br />635-8-121TR <br />Pullboxes, Composite 17"00"x12" W/ Lid Traffic Rated (F&I) <br />EA <br />
The URL can be used to link to this page
Your browser does not support the video tag.