My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1974-062
CBCC
>
Resolutions
>
1970'S
>
1974
>
1974-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 3:20:25 PM
Creation date
10/13/2022 2:20:05 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1974-062
Approved Date
07/10/1974
Resolution Type
Establishing Fees for Permits for Mechanical Code
Subject
Establishing Fees for Permits for Mechanical Code
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RC] <br />[40 <br />RESOLUTION No. 74- 62 <br />WHEREAS, this Board has adopted a Mechanical Code <br />for Indian River County, Florida; and, <br />WHEREAS, said Ordinance provides that this Board estab- <br />lish a schedule of Fees for Permits issued under said Ordinance, <br />NOW, THEREFORE, BE IT RESOLVED by the Board of County <br />Commissioners of Indian River County, Florida, that the following <br />schedule of Fees is hereby established for the issuing of Mechanical <br />Permits: <br />MECHANICAL PERMIT FEES <br />(a) <br />For issuing each Permit $3.00 <br />(b) <br />AIR CONDITIONING AND REFRIGERATION <br />For the purpose of charging fees, <br />1 ton of refrigeration will equal <br />12,000 BTU's per hour or 1 H.P. total <br />connected loan <br />The first 5 tons or fractional part 5.00 <br />The next 5 tons up to and including <br />10 tons - per ton 1.00 <br />Over 10 tons - per ton additional 2.00 <br />All major repairs or replacements, <br />same fees as above. <br />WINDOW UNITS OR WALL UNITS(Where no <br />construction work is involved in the <br />building or duct work attached) <br />For the first 5 units - each 3.00 <br />For the next 50 units - each 2.00 <br />For the next 100units - each 1.50 <br />All others - each 1.00 <br />11 <br />-i (c) <br />Fee for Re -Inspection. In case it <br />becomes necessary to make a re -inspec- <br />tion of a Heating, Ventilating, Air <br />Conditioning or Refrigeration System, <br />the installer of such equipment shall <br />pay a Re -Inspection Fee of Five ($5.00) <br />Dollars. <br />(d) <br />Temporary Operation Inspection Fee; For <br />inspecting a Heating, Ventilating, Re- <br />frigeration, or Air Conditioning System, <br />a fee of Five ($5.00) Dollars shall be <br />paid by the Contractor requesting such <br />inspection. If the system is not approved <br />for temporary operation on the first inspection, <br />for each subsequent inspection for such pur- <br />pose, the usual Re -inspection Fee will be <br />charged. <br />(e) <br />In all buildings except one and two family <br />dwellings using self-contained Air Conditioning <br />Units less than two tons, the fee charged shall <br />be that for the total tonnage of all units <br />combined (see Paragraph (a) above for rate). <br />Minimum fee shall be Five ($5.00) Dollars. <br />(f) <br />Boilers based on BTU Input: <br />33,000 BTU (1 BHP) to 165,000 (5 BHP) $5.00 <br />165,001 BTU (5 BHP) to 330,000 (10 BHP) 10.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.