Laserfiche WebLink
Work Order No. 55 <br />661h Avenue Phase II Utility <br />Adjustments <br />TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately five (5) months from the Notice to Proceed (NTP). <br />NTP <br />contingent upon BOCC approval <br />Constructability Submittal (60% Design Drawings) <br />Permit Submittal <br />Biddability Submittal (90% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />2 months following NTP <br />3 months following NTP <br />3 months following NTP <br />4 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />