My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-166B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-166B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2022 11:18:12 AM
Creation date
10/24/2022 11:17:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/13/2022
Control Number
2022-166B
Agenda Item Number
8.W.
Entity Name
Southeastern Surveying & Mapping Corporation
Subject
Master Agreement for Professional Surveying and Mapping Services
RFQ 2022064
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
View images
View plain text
Subsurface Utility Engineering Services <br />Personnel Classification <br />Project Manager <br />Senior Technician <br />Two Person SUE Crew <br />Three Person SUE Crew <br />Administrative Assistant/ Clerical <br />Vacuum Excavation (Test Hole/ WH) <br />1 Test Hole/Dirt <br />1 Test Hole/Asphalt/Concrete <br />2 - 19 Test Hole/Dirt <br />2 - 19 Test Hole/Asphalt/Concrete <br />20 - 49 Test Hole/Dirt <br />20-49 Test Hole/Asphalt/Concrete <br />Day Rate <br />$177.00 / per hour <br />$133.00 / per hour <br />$216.00 / per hour <br />$301.00 / per hour <br />$78.00 / per hour <br />$617.00 <br />$766.00 <br />$528.00 / each <br />$602.00 / each <br />$472.00 / each <br />$543.00 / each <br />Concrete Radar Mapping/Imaging <br />(Concrete assessment/inspection, grid scans & debris assessment) <br />One Person Crew $236.00 / per hour <br />ssmic <br />SUE > SURVEY - GIS <br />Night Rate <br />$265.00 / per hour <br />$199.00 / per hour <br />$324.00/ per hour <br />$451.00/ per hour <br />$118.00/ per hour <br />$925.00 <br />$1,149.00 <br />$793.00 / each <br />$902.00 / each <br />$707.00 / each <br />$814.00 / each <br />$366.00 / per hour <br />Maintenance of Traffic (MOT/TTC) <br />If required, MOT specialist will be contracted, and the cost will be passed on with a 10% mark-up for coordination. <br />Off Duty Officer(s) (if required per permitting) billing will be a pass-through cost and are not included in the per lane <br />closure <br />Lane Closure $1015.00 / per closure <br />Sidewalk Closure $327.00 / per closure <br />Surveying Services for Utility Projects <br />Project Manager/ Professional Surveyor & Mapper $177.00 / per hour <br />Administrative Assistant/ Clerical $78.00 / per hour <br />Two Person Survey Field Crew $178.00 / per hour <br />Three Person Survey Field Crew $233.00 / per hour <br />Mast Arms <br />Subsurface Utility Locating Service <br />$1,559.00 / per pole <br />Concrete/Asphalt Removal & Repair <br />$436.00 / per pole <br />Survey Staking of Pole Locations <br />$432.00 / per pole <br />Flagman Control, Per Pole Location <br />$191.00 / per pole <br />Mobilization <br />Per Project in excess of 50 Miles from Home Office $1,128.00 <br />Per Diem/Lodging Expenses <br />Per Day, Two Person Crew $396.00 <br />Per Day, Three Person Crew $540.00 <br />$1,233.00 / per closure <br />$436.00 / per closure <br />$265.00 / per hour <br />$118.00 / per hour <br />$266.00 / per hour <br />$350.00 / per hour <br />$1,673.00 <br />If HAZWOPER CERTIFIED personnel are required there will be a 20% increase in the Hourly Rate. <br />Overtime rates will be charged for jobs requiring night work or Emergency/On-Call Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).