My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-193
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 12:40:40 PM
Creation date
10/27/2022 12:40:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2022
Control Number
2022-193
Agenda Item Number
12.G.1.
Entity Name
Florida Department of Transportation (FDOT)
Subject
Supplemental Agreement No. 3 to Agreement FM No. 431759-2-54-01.for
Construction of Intersection Improvements at SR 60 and 43rd Avenue.
Contract No. G-0K60
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-60 <br /> STATE-FUNDED GRANT AGREEMENT Pf2OGRAM MANAGEMENT <br /> 05!21 <br /> plans for compliance with all applicable standards of the Department, as provided in Exhibit "0", Terms <br /> and Conditions of Construction,which is attached to and incorporated into this Agreement. <br /> f. The Recipient shall adhere to the Department's Conflict of Interest Procedure (FDOT Topic No. 375-030- <br /> 006). <br /> g. The Recipient will provide copies of the final design plans and specifications and final bid documents to the <br /> Department's Construction Project Manager prior to commencing construction of the Project. The <br /> Department will specify the number of copies required and the required format. <br /> h. The Recipient shall require the Recipient's contractor to post a payment and performance bond in <br /> accordance with applicable law. <br /> i. The Recipient shall be responsible to ensure that the construction work under this Agreement is performed <br /> in accordance with the approved construction documents,and that it will meet all applicable Recipient and <br /> Department standards. <br /> j. Upon completion of the work authorized by this Agreement, the Recipient shall notify the Department in <br /> writing of the completion of construction of the Project; and for all design work that originally required <br /> certification by a Professional Engineer, this notification shall contain an Engineers Certification of <br /> Compliance, signed and sealed by a Professional Engineer, the form of which is attached hereto and <br /> incorporated herein as Exhibit "C", Engineers Certification of Completion. The certification shall state <br /> that work has been completed in compliance with the Project construction plans and specifications. If any <br /> deviations are found from the approved plans, the certification shall include a list of all deviations along with <br /> an explanation that justifies the reason to accept each deviation. <br /> k. The Recipient shall provide the Department with as-built plans of any portions of the Project funded through <br /> the Agreement prior to final inspection. <br /> 11. Maintenance Obligations: In the event the Project includes construction then the following provisions are <br /> incorporated into this Agreement: <br /> a. The Recipient agrees to maintain any portion of the Project not located on the State Highway System <br /> constructed under this Agreement for its useful life. If the Recipient constructs any improvement on <br /> Department right-of-way,the Recipient <br /> ❑ shall <br /> ®shall not <br /> maintain the improvements located on the Department right-of-way made for their useful life If the Recipient <br /> is required to maintain Project improvements located on the Department right-of-way beyond final <br /> acceptance, then Recipient shall, prior to any disbursement of the State funding provided under this <br /> Agreement, also execute a Maintenance Memorandum of Agreement in a form that is acceptable to the <br /> Department. The Recipient has agreed to the foregoing by resolution, and such resolution is attached and <br /> incorporated into this Agreement as Exhibit"0". This provision will survive termination of this Agreement. <br /> 12. State Single Audit: The administration of resources awarded through the Department to the Recipient by this <br /> Agreement may be subject to audits and/or monitoring by the Department. The following requirements do not limit <br /> the authority of the Department to conduct or arrange for the conduct of additional audits or evaluations of state <br /> financial assistance or limit the authority of any state agency inspector general, the Auditor General, or any other <br /> state official. The Recipient shall comply with all audit and audit reporting requirements as specified below. <br /> a. In addition to reviews of audits conducted in accordance with Section 215.97, Florida Statutes, monitoring <br /> procedures to monitor the Recipient's use of state financial assistance may include but not be limited to on- <br /> site visits by Department staff and/or other procedures including, reviewing any required performance and <br /> financial reports, following up, ensuring corrective action, and issuing management decisions on <br /> weaknesses found through audits when those findings pertain to state financial assistance awarded through <br /> the Department by this Agreement. By entering into this Agreement, the Recipient agrees to comply and <br /> Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.