My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-193
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 12:40:40 PM
Creation date
10/27/2022 12:40:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2022
Control Number
2022-193
Agenda Item Number
12.G.1.
Entity Name
Florida Department of Transportation (FDOT)
Subject
Supplemental Agreement No. 3 to Agreement FM No. 431759-2-54-01.for
Construction of Intersection Improvements at SR 60 and 43rd Avenue.
Contract No. G-0K60
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> DELIVERABLES <br /> FM#431759-2-54-01 <br /> ITEM NO. DESCRIPTION UNIT ESTIMATED QTY. <br /> 711-11-222 THERMOPLASTIC.STANDARD,YELLOW,SOLID,18" LF 77 <br /> 711-16-101 THERMOPLASTIC,STANDARD,WHITE,SOLID 6" GM 3.1 <br /> ,THERMOPLASTIC STANDARD- OTHER SURFACES,WHITE,6",10-30 SKIP OR 3-9 <br /> 711-16-131 (LANE DROP _ GM I 3.59 <br /> 711.16-201 _THERMOPLASTIC,STANDARD,YELLOW,SOLID 6" GM 2.37 <br /> 711-16-231 'THERMOPLASTIC,STANDARD,YELLOW,SKIP,6" - _ GM 1._____ 0 44 <br /> 1 <br /> 715-1-13 BLIGHTING CONDUIT F&I INSULATED NO.4 1 LF 36765 <br /> 715-4-13 !STANDARD LIGHT POLE COMPLETE W/CONCRETE-BASE,F&I,WIND SPEED 160 EA 30 <br /> 715-4-33 ,CONFLICT LIGHT POLE COMPLETE W/CONCRETE-BASE,F81,WIND SPEED 160 EA 36 <br /> 715-5-30 LUMINAIRE AND BRACKET ARM MOUNTED ON SIGNAL POLE,F81 _ EA 4 <br /> !LOAD CENTER(INCLUDES ALL COMPONENTS LISTED ON SERVICE POINT DETAILS 1--}—— <br /> 715-7-11 DRAWING) ' EA i 3 <br /> 715-500-1 POLE CABLE DISTRIBUTION SYSTEM CONVENTIONAL _ EA _I 70 <br /> Change Order 01 Deliverables <br /> 'Extended MOT I Day B7 <br /> {,Extended Erosion Control and Maintenance 12y Day <br /> 87 <br /> f Extended Indirect Costs and Expenses _ I1 Day tI 68 <br /> !Polyurethane <br /> (TRC) LS 1 <br /> 'Polyurethane Infection(Urelek) _- -___— LB 24170 <br /> —t <br /> Pick up Truck(MOT,Vac,&CCN Crews) `I Hour—r--- <br /> 81 <br /> —_ :VAC Truck 1 Day 1 9 <br /> ,CCTV Truck - I Hour 81 <br /> 1VAC Truck Operator Hour 81 <br /> ,Foreman(MOT,CCTV,&MOT Crews LS 1 <br /> Skilled Laborer(Vac&CCTV&MOT crews LS 1 <br /> CCTV Truck Operator � 1 Hour 1 81 <br /> CEI CLASSIFICATIONS <br /> SR.PROJECT ENGINEER <br /> PROJECT ADMINISTRATOR <br /> SR.INSPECTOR <br /> INSPECTOR <br /> INSPECTOR'S AIDE <br /> QUALITY CONTROL(QC)MANAGER <br /> EARTHWORK CONSTRUCTION INSPECTOR LEVEL 1 <br /> EARTHWORK CONSTRUCTION INSPECTOR LEVEL 2 <br /> ASPHALT PAVING TECHNICIAN LEVEL 1 <br /> ASPHALT PAVING TECHNICIAN LEVEL 2 <br /> BRIDGE INSPECTOR 2 <br /> BRIDGE INSPECTOR 1 <br /> CONTRACT SUPPORT SPECIALIST <br /> ASSISTANT PROJECT ADMINISTRATOR <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.