Laserfiche WebLink
,^, <br />Civil Rights Comments with concurrence: <br />Grant recipient must comply with all applicable Federal laws and regulations related to <br />this project, including the ADA Standards for Transportation Facilities, based on the <br />U.S. Access Board's ADA Accessibility Guidelines. Found here: http://www.access- <br />board. gov/g uidel Ines-and-standards/transportation/facilities/ada-standards-for- <br />transportation-facilities <br />Additionally, recipient must comply with Title IV requirements as outlined in 49 CFR <br />Section 21.9(b)(3). <br />Requirements to Remember for: Construction of New Facilities <br />• As required under DOT ADA Standard 201 and DOT ADA Regulation 49 C.F.R. <br />Comment 37.43(a)(1), Grant recipient must ensure that altered or added portions of the facility <br />must be made accessible. <br />• As required by DOT ADA Regulation 49 C.F.R. 37.43(a)(2) and DOT ADA Standard <br />202.3, Grant recipient must ensure that the path of travel to the altered or added portion <br />of the facility must be made accessible, to the maximum extent feasible. <br />• As required by DOT ADA Standard 202.4 and DOT ADA Regulation 49 C.F.R. <br />37.43(e)(1), if the path of travel cannot be made accessible, Grant recipient must submit <br />to FTA an analysis demonstrating that the cost of making the path of travel accessible is <br />disproportionate to (i.e., > 20%) the cost of the alterations or additions to the primary <br />function area. <br />• As required by DOT ADA Standard 202.4 and DOT ADA Regulation 49 C.F.R. <br />37.43(b), if the path of travel cannot be made accessible, Grant recipient must submit to <br />FTA an analysis demonstrating that site-specific conditions prevent you from making the <br />path of travel accessible. Include relevant diagrams and maps. <br />Comment By Boyd Melton <br />Comment Application Details <br />Type <br />Date 12/20/2021 <br />Comment NOTE - As PAA is selected a task will be generated in TrAMs for an initial FFR after <br />award and prior to grant execution. <br />Application Review Comments <br />Comment By Robert Sachnin <br />Comment Pre -Award Manager Returns Application <br />Type <br />Date 12/1/2021 <br />Good Afternoon - please find joint comments below: <br />1. Application Title: Please add and PM after Capital Assistance <br />Part 2 Application Information: <br />Comment 1. Application End Date/Period of Performance: please change from 3/31/28 to 3/30/31. <br />2_ Executive Summary: Please add the 5 OMB executive summary requirements, which <br />FTA is incorporating into all applications. Please also keep these 5 topics together and <br />provide a concise, plain language description for each: 1) Purpose of Award, 2) <br />Activities to be Performed, 3) Expected Outcomes, 4) Intended Beneficiaries, & 5) <br />127 <br />