My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/13/2022
CBCC
>
Meetings
>
2020's
>
2022
>
09/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 1:59:48 PM
Creation date
10/31/2022 10:20:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/13/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discrepancies that he has discovered in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br />7.7 Contractor is registered with and will use the Department of Homeland Security's E - <br />Verify system (www.e-verify.gov) to confirm the employment eligibility of all newly hired <br />employees for the duration of this agreement, as required by Section 448.095, F.S. Contractor is <br />also responsible for obtaining proof of E -Verify registration for all subcontractors. <br />ARTICLE 8 CONTRACT DOCUMENTS <br />The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR <br />concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 All required insurance certificates. <br />8.3 Schedule of Subcontractors (Section 00431). <br />8.4 Disclosure of Relationships (Section 00452). <br />8.5 Certification Regarding Prohibition Against Contracting with Scrutinized Companies <br />(Section 00432). <br />8.6 Certification Regarding Lobbying (Section 00430). <br />8.7 Sworn Statement under the Florida Trench Safety Act (Section 00454). <br />8.8 General Information Required for Bidders (Section 00456) <br />8.9 Public Construction Bond (Section 00600). <br />8.10 Notice of Award and Notice to Proceed (examples in Section 00800). <br />8.11 General Conditions (Section 00700). <br />8.12 Supplementary Conditions (Section 00800). <br />8.13 Documents / Specifications bearing the title "West Wabasso Septic to Sewer Phase 3". <br />8.14 Drawings, inclusive with each sheet bearing the following general title "West Wabasso Septic to <br />Sewer Phase 3". <br />8.15 Addenda numbersl to 3, inclusive. <br />8.16 CONTRACTOR'S Bid Form (Section 00310). <br />8.17 Specifications bearing the title "Department of Utility Services, Water & Wastewater, Utility <br />Standards, May 2019" or the latest version thereof. <br />8.18 The following, which may be delivered or issued after the effective date of the Agreement and are <br />not attached hereto: All written amendments and other documents amending, modifying, or <br />supplementing the Contract Documents pursuant to Paragraphs 3.04 of the General Conditions. <br />There are no Contract Documents other than those listed above in this Article 8. The Contract Documents <br />may only be amended, modified or supplemented as provided in Paragraphs 3.04 of the General <br />Conditions. <br />298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.