My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/13/2022
CBCC
>
Meetings
>
2020's
>
2022
>
09/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 1:59:48 PM
Creation date
10/31/2022 10:20:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/13/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022072 RFP for Spoonbill Marsh Maintenance <br />CONTRACTOR written notice seven (7) calendar days in advance. <br />4. Debris to be removed consists of decomposing vegetation and silt, overhanging canopy of mangrove <br />trees impeding flow, fallen tree limbs, and some tree roots. <br />5. CONTRACTOR shall place debris on each bank well away from water channel. Debris is not required to be removed <br />from site. <br />6. CONTRACTOR shall use a per foot price. <br />ITEM N0.11 NORTH AND SOUTH BREECH DEBRIS REMOVAL <br />11.1 Summary <br />1. North and South Breeches are discharge water channels connecting ponds to the Lagoon. Depth 1 <br />to 4 feet. <br />2. CONTRACTOR shall furnish all labor, equipment, and incidentals required to remove debris from the <br />North and South Breeches (each bank). <br />3. The breech locations are shown in Drawing 11. <br />11.2 Frequency and Conditions <br />1. CONTRACTOR shall clean the North and South Breeches quarterly, four (4) times per year, once in <br />March, June, September, and December. If weather conditions prevent scheduled cleaning, cleaning <br />will be rescheduled per the COUNTY. <br />2. COUNTY may require additional cleaning of debris from the north and south breech after storm <br />events and will provide the CONTRACTOR written notice seven (7) calendar days in advance. <br />3. Debris consist of decomposing vegetation and silt, overhanging canopy of mangrove trees impeding <br />flow, fallen tree limbs and some tree roots. <br />4. CONTRACTOR shall be working in water. <br />5. CONTRACTOR shall place debris on each bank well away from water channel. Debris is not required <br />to be removed from site. <br />ITEM NO. 12 ROAD MAINTENANCE <br />12.1 Summary <br />1. CONTRACTOR shall furnish all labor, equipment, and incidentals required for repairing and <br />maintaining roads. <br />2. COUNTY shall furnish suitable roadway material as approved by the COUNTY. <br />3. Roads shown in Drawing 12. <br />12.2 Frequency and Conditions <br />1. Once each year in December, CONTRACTOR shall repair roads. If weather conditions prevent <br />scheduled road repairs, road repairs will be rescheduled per the County. <br />2. CONTRACTOR shall begin road maintenance starting at the end of pavement nearest US Highway 1. <br />3. COUNTY may require additional site work or road repair due to weather-related erosion or other <br />unforeseen events and will provide the CONTRACTOR written notice seven (7) calendar days in <br />advance. <br />4. COUNTY will provide roadway material for certain road -related work. <br />Scope Page 7 <br />373 <br />
The URL can be used to link to this page
Your browser does not support the video tag.