Laserfiche WebLink
g9Aa1�a <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard D. Szpyrka, P.E., Public Works Director <br />James W. Ennis, P.E., Asst. Public Works Director <br />FROM: Mark Winslow, P.E., Project Engineer <br />SUBJECT: Work Order No. 54 - Kimley-Horn and Associates, Inc. <br />901h Avenue & Oslo Road Corridor Improvements (IRC -2215) <br />DATE: September 1, 2022 <br />DESCRIPTION AND CONDITIONS <br />On April 17, 2018, the Board of County Commissioners approved the Continuing Consulting Engineering Service <br />Agreement for Professional Services with Kimley-Horn and Associates, Inc. and on May 18, 2021 approved the <br />Renewal and Amendment No. 1 to the Agreement. The purpose of Work Order No. 54 is to provide survey, and <br />geotechnical investigation, roadway design, and permitting services forthe proposed roadway improvements to be <br />made to the 90th Avenue and Oslo Road Corridor. <br />As part of the Oslo Road/1-95 interchange project the Florida Department of Transportation (FDOT) will be <br />constructing 13th Street SW between 86th and 90th Avenue SW. Construction of 13th Street SW will be a paved <br />roadway with 12 -foot lanes and 5 -foot paved shoulders. The design structure for the roadway will be for heavy <br />truck traffic due to the sand mine and agricultural use in the area. <br />As part of the infrastructure improvements in this area, Public Works is proposing to improve 90th Avenue from an <br />unpaved roadway to a 2 -lane rural paved roadway with 12 -foot lanes and 5 -foot paved shoulders between 13th <br />Street SW and Oslo Road, approximately 3,000 linear feet. In addition to improving 90th Avenue, Public Works is <br />also proposing improvements to Oslo Road from an unpaved roadwayto a 2 -lane rural paved roadwaywith 12 -foot <br />lanes and 5 -foot paved shoulders between 90th Avenue and the western terminus of the FDOT Oslo Road/1-95 <br />interchange improvements, approximately 1,600 linear feet. <br />Kimley -Horn and Associate's Work Order No. 54 for design is for a total lump sum amount of $309,300. <br />FUNDING <br />Funding in the amount of $309,300 for Work Order No. 54 is available in Account No. 10215341-066510- <br />22039/Traffic Impact Fees — District 3/90th Ave & Oslo Rd Corridor. <br />RECOMMENDATION <br />Staff recommends approval of Work Order No. 54 to Kimley-Horn and Associates, Inc., authorizing the professional <br />services as outlined in the Scope of Services and requests the Board authorize the Chairman to execute Work Order <br />No. 54 on their behalf for a lump sum amount of $309,300. <br />ATTACHMENTS <br />Kimley-Horn Work Order 54 <br />AGENDA ITEM FOR SEPTEMBER 13, 2022 <br />390 <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Tech nologies\eas/PDF 8\@BCL@9406E294\@BCL@9406E294.doc <br />