Laserfiche WebLink
Attachment B <br />Cost Estimate <br />IRCDUS - 8" WM - 51st Court <br />Bridge Crossing <br />Description <br />Qty <br />Unit I <br />Price <br />Total <br />Mobilization <br />1 <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />MOT <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />12"x8" Tapping Slv/Valve <br />1 <br />LS <br />54,500.00 <br />$4,500.00 <br />Connect to Exist. 8" GV <br />1 <br />LS <br />$500.00 <br />$500.00 <br />8" PVC WM <br />170 <br />LF <br />$60.00 <br />$10,200.00 <br />8" DIP WM (Flanged) - 160 LF <br />1 <br />LS <br />$90,000.00 <br />$90,000.00 <br />Concrete Cradle (Bridge) <br />10 <br />EA <br />$500.00 <br />$5,000.00 <br />Concrete Cradle (Earth) <br />6 <br />EA <br />$750.00 <br />$4,500.00 <br />Conc. Barrier- Flowable Fill/Pass Under <br />2 <br />EA <br />$1,000.00 <br />$2,000.00 <br />Replace Sidewalk <br />120 <br />SF <br />$7.50 <br />$900.00 <br />Bac-T/Sample Points <br />2 <br />EA <br />$750.00 <br />$1,500.00 <br />Flush/Chlorinate <br />1 <br />LS <br />$500.00 <br />$500.00 <br />Geotech - Densities <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Survey Stake-Outs/As-Builts <br />1 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Subtotall <br />$141,100.00 <br />Contingency (15%) <br />$21,165.00 <br />Grand Total <br />$162,265.00 <br />