My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-224
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2022 11:26:33 AM
Creation date
11/21/2022 10:48:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/01/2022
Control Number
2022-224
Agenda Item Number
12.G.2.
Entity Name
Florida Department of Transportation (FDOT)
Subject
Agreement for District Four Highway Maintenance Memorandum for
Oslo Road and I-95 Interchange Construction Financial Project No. 413048-2
Document Relationships
2022-083
(Agenda)
Path:
\Resolutions\2020's\2022
2022-225
(Cover Page)
Path:
\Official Documents\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, the AGENCY by IResolution Ion the day of ;✓0 V 207-7a copy <br />of which is attached hereto as Exhibit B and by this reference made a part hereof, desires to enter into <br />this Agreement and authorizes its officers to do so. <br />NOW THEREFORE, for and in consideration of the mutual benefits to flow each to the other, the <br />Parties covenant and agree as follows: <br />1. The recitals set forth above are true and correct and are deemed incorporated herein. <br />2. The DEPARTMENT has undertaken and obtained the approval of Federal participation for the <br />Project. The AGENCY is responsible for additional Project costs determined to be Federal Aid Non - <br />Participating. The AGENCY shall allow the DEPARTMENT and its contractors to enter onto the <br />existing AGENCY property. No further permit or agreement from the Agency shall be required to <br />construct this Project. I <br />3. The Agency will construct paved surfaces on 90th Avenue from 13th Street SW to Oslo Road, and <br />Oslo Road from 901h Avenue to the western project limits.I <br />4. The AGENCY shall continue to maintain the existing roadway and any property owned by <br />AGENCY until the DEPARTMENT begins construction of the Project. The DEPARTMENT shall be <br />responsible for mowing and litter removal during the duration of the Project. <br />S. Upon "final acceptance" by the DEPARTMENT of the Project, (as "final acceptance" is described <br />in the Standard Specifications for Roadway and Bridge Construction dated 2019, as amended), <br />and Notice thereof to the AGENCY, the AGENCY shall maintain the Project, at its own cost, in <br />accordance with the following Federally and State accepted standards: (a) FDOT Design Manual <br />(FDM), current edition (b) Florida Green Book dated 2016, as amended (c) Governing standards <br />and specifications: FDOT Design Standards dated FY 2019-20, as amended (d) Standard <br />Specifications for Roadway and Bridge Construction dated 2019, as amended by contract <br />documents, and (e) Manual on Uniform Traffic Control Devices (MUTCD), current edition, or as <br />amended. Maintenance of said Project includes maintaining Iroadway, sidewalk, signing and <br />pavement marking, and drainage systems that are outside of the Limited Access ROW I. <br />a. The AGENCY grants to the DEPARTMENT all rights necessary to enter and <br />construct the Project. <br />b. The Department shall give the AGENCY seven (7) days' notice before final inspection. <br />The AGENCY will have the opportunity to inspect and identify corrections to the <br />PROJECT within seven (7) days' notice and the DEPARTMENT agrees to undertake those <br />corrections prior to final acceptance so long as the corrections comply with the Final <br />Proposed Construction plans and specification previously approved by both the <br />DEPARTMENT and the AGENCY. <br />wa <br />
The URL can be used to link to this page
Your browser does not support the video tag.