My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-228
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 12:11:29 PM
Creation date
11/21/2022 12:10:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/01/2022
Control Number
2022-228
Agenda Item Number
15.B.6.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order 17 for Segment 3, Cell 1 top of waste grades evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1200 Riverplace Blvd., Suite 710 <br />Geosyntec ° Jacksonville, Florida 32207 <br />PH 904.858.1818 <br />consultants www.geosyntec.com <br />• Phase 1 — Project Management and Meetings; <br />• Phase 2 — Files Review and Data Evaluation; <br />• Phase 3 — Site Inspection Visit; and <br />• Phase 4 — Engineering Drawings. <br />The remainder of this section presents a brief description of the activities to be performed in each <br />phase. <br />Phase 1: Project Management and Meetings <br />Under this phase, Geosyntec will perform project planning and management responsibilities, such <br />as correspondence with SWDD and Republic, invoice review, project coordination, and <br />videoconference meetings. Geosyntec has also included a budget for preparation and attendance <br />(by two Geosyntec personnel) at two meetings: (i) kickoff meeting with SWDD and Republic staff <br />to discuss the proposed scope of work; and (ii) a design review meeting upon completion of the <br />top of waste grades drawings. <br />Phase 2: Files Review and Data Evaluation <br />Under this phase Geosyntec will review electronic drawings (i.e., aerial surveys, permitted waste <br />grading plans), and relevant files to evaluate remaining airspace volume at Cell 1. <br />Phase 3: Site Inspection Visit <br />Under this phase Geosyntec personnel will conduct a Site inspection at Cell 1. Photographic <br />records, field notes and spot elevations at select locations will be recorded with a GPS to <br />corroborate information collected during the data evaluation phase. <br />Phase 4: Engineering Drawings <br />Under this phase, Geosyntec will prepare engineering drawings to aid waste filling operations at <br />Cell 1. The following sheets will be included: <br />• Cover Sheet <br />• Existing Conditions; <br />• Top of Waste Grading Plan and Control Points; <br />• Isopach of Remaining Waste to be Filled; and <br />• Landfill Cross Sections. <br />JL22066_IRCL_Segment3_Celll Waste_Grades_Evaluation <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.