My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 12:53:37 PM
Creation date
11/23/2022 12:50:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work No. 56 for Central (Gifford) Wastewater
Treatment Plant Generator Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 226607 <br />2. Respond to Contractor RFIs <br />3. Attend a per -construction meeting, provide time for up to six (6) field visits, during <br />different stages of the construction; some visits may also include attending a progress <br />meeting and provide an email report of visit. <br />4. Witness a startup and testing phase, including provide a punch of electrical items found <br />during startup visit. <br />5. Provide the Owner with As -built drawings, based on Contractor redlines. <br />FEE SUMARY <br />Task 1: Design Documents Phase: $60,000.00, lump sum <br />Task 2: Bidding/Permitting Phase: $ 3,000.00, lump sum <br />Task 3: Construction Phase: $26,000.00, lump sum <br />I trust the above scope is in agreement with your needs and expectations. If you have <br />questions or comments regarding the above, please call or write. <br />Very truly yours, <br />C & W Engineering, Inc. <br />Michael Guida, P.E. <br />JLR/nl/file <br />
The URL can be used to link to this page
Your browser does not support the video tag.