My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-230A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-230A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 1:59:56 PM
Creation date
12/5/2022 1:58:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/08/2021
Control Number
2022-230A
Agenda Item Number
8.G.
Entity Name
Atlantic Metal II of Vero Beach, Inc.
Subject
Section 00520 Agreement for Roof Replacement at the Central Regional Wastewater Treatment Facility
Bid Number
2022041
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the General Conditions on or before the 300th calendar day after the date when the <br />Contract Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times specified <br />in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 <br />of the General Conditions. Liquidated damages will commence for this portion of work. The <br />parties also recognize the delays, expense, and difficulties involved in proving in a legal <br />proceeding the actual loss suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that <br />as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER <br />566.00 for each calendar day that expires after the time specified in paragraph 4.02 for <br />Substantial Completion until the Work is substantially complete. After Substantial <br />Completion. if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work <br />within the Contract Time or any proper extension thereof granted by OWNER, <br />CONTRACTOR shall pay OWNER $566.00 for each calendar day that expires after the time <br />specified in paragraph 4.02 for completion and readiness for final payment until the Work is <br />completed and ready for final payment. <br />ARTICLE 5 - CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.13, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract: <br />Numerical Amount: $527,672 <br />Written Amount: Five hundred twenty-seven thousand six hundred seventy two <br />dollars <br />ARTICLE 6 - PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. CONTRACTOR shall submit Applications for Payment in accordance with Article <br />14 of the General Conditions. Applications for Payment will be processed by <br />ENGINEER as provided in the General Conditions and the Contract Documents. <br />6.02 Progress Payments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.