My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2022
CBCC
>
Meetings
>
2020's
>
2022
>
09/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 10:14:07 AM
Creation date
12/12/2022 9:40:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/20/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
':OF <br />Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: September 1, 2022 <br />To: Jason E. Brown, County Administrator <br />From: Sean C. Lieske, Director of Utility Services <br />Prepared by: Harrison Youngblood, PE, Utilities Engineer, Utility Services <br />Subject: 66th Avenue Phase II Roadway Improvements — Utility -Related Work <br />Background: <br />Indian River County is in the design phase of upgrading 66th Avenue from 69th Street to 85th Street, which <br />is the last phase of the project. In order to plan for future developments in the area, coupled with reduced <br />impact to the current utilities along that corridor of road, a redesign of the utility adjustments would be <br />required. <br />Analysis: <br />The Indian River County Department of Utility Services (IRCDUS) desires to design and permit utility <br />extensions/stub-outs and conflict resolutions between the existing underground utilities and the proposed <br />storm drainage and roadway improvements associated with the 66th Avenue Phase II Roadway Widening <br />project. The anticipated utility relocations associated within the project limits include approximately 500 <br />linear feet of 4" force main relocation, four (4) 16" water main deflections in conflict with the proposed <br />storm drainage, one (1) fire hydrant adjustment to final grade, three (3) fire hydrant relocations from the <br />proposed roadway widening, a 12" water main stub out at the northeast corner of 81" Street and 66th <br />Avenue, and a water main stub out at Liberty Park. The proposed utility improvements will be submitted <br />to the county for review and comment at constructability (60%), biddability (90%), and production (100%) <br />design submittal stages. <br />Funding: <br />Funds in the amount of $21,500.00 for this project are accounted for in the Utilities/66th Ave Utility <br />Relocations account, number 471-169000-22516, which are derived from the Utilities operating fund <br />balance. Utilities operating funds are derived from water and sewer sales. <br />Description <br />Account Number <br />Amount <br />Utilities/66th Ave Utility Relocations <br />471-169000-22516 <br />$21,500.00 <br />Recommendation: <br />Staff recommends that the Board of County Commissioners authorize the work order for Kimley-Horn & <br />Associates to perform the utility adjustments design for the amount of $21,500, and authorize the <br />Chairman to sign on their behalf. <br />Attachment: <br />1. Work Order No. 55 KHA <br />Page 1f4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.