My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2022
CBCC
>
Meetings
>
2020's
>
2022
>
09/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 10:14:07 AM
Creation date
12/12/2022 9:40:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/20/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Red text indicates pricing changed by the second amendment, effective October 1, 2022. <br />12 <br />Group 2 <br />Per <br />Unit Price <br />OSP Construction Conduit, Pull and Junction Boxes <br />630-5-12-24 <br />-------------------------------------------- <br />Conduit, 2" 10' PVC @ 24", Machine Trench (F&I) <br />LF <br />$ <br />5.60 <br />630-5-12-36 <br />-------------------------------------------- <br />Conduit, 2" PVC @ 36" Machine Trench (F&I) <br />LF <br />$ <br />6.80 <br />630-5-13-24 <br />-------------------------------------------- <br />Conduit, 2" PVC @ 24", Hand Trench (F&I) <br />LF <br />$ <br />7.10 <br />630-5-13-36 <br />-------------------------------------------- <br />Conduit, 2" PVC @ 36", Hand Trench (F&I) <br />LF <br />$ <br />9.25 <br />630-5-12-ep <br />-------------------------------------------- <br />Conduit, 2" PVC Additional Pipe In Trench (F&I) <br />LF <br />$ <br />2.50 <br />630-6-1.25 <br />-------------------------------------------- <br />Innerduct, 11/4" Corrugated, Colored (F&I) <br />LF <br />$ <br />1.80 <br />630-6-41.25 <br />-------------------------------------------- <br />Conduit Plowing 4W1.25" HDPE, Colored (F&I) <br />LF <br />$ <br />10.30 <br />630-6-23 <br />-------------------------------------------- <br />MaxCell Placement in existing 2" Conduit - 2" - 3 Cell (F&I) <br />LF <br />$ <br />3.10 <br />630-6-33 <br />-------------------------------------------- <br />MaxCell Placement in existing 3" Conduit - 3" - 3 Cell (F&I) <br />LF <br />$ <br />4.10 <br />630-6-43 <br />-------------------------------------------- <br />MaxCell Placement in existing 4" Conduit - 4" - 3 Cell (F&I) <br />LF <br />$ <br />4.80 <br />630-6-00-18 <br />-------------------------------------------- <br />Cable Direct Bury, Hand Dig @ 18" (1 Only) <br />LF <br />$ <br />5.15 <br />630-6-00-30 <br />-------------------------------------------- <br />Cable Direct Bury, Plow @ 30" (1 Only) <br />LF <br />$ <br />7.40 <br />630-6-12-db <br />-------------------------------------------- <br />Directional Bore, 2" HDPE (F&I) <br />LF <br />$* <br />19.00 <br />630-6-14-db <br />-------------------------------------------- <br />Directional Bore, 2" HDPE, Special Conditions (F&I) <br />LF <br />$* <br />23.00 <br />630-6-18-db <br />-------------------------------------------- <br />Directional Bore, 8" Under Waterway <1,000 If (F&I) <br />LF <br />$ <br />55.00 <br />630-6-12-grs <br />-------------------------------------------- <br />Conduit, 2" GRS, (F&I) <br />LF <br />$ <br />9.70 <br />630-6-14-grs <br />-------------------------------------------- <br />Conduit, 4" GRS, (F&I) <br />LF <br />$ <br />17.80 <br />630-6-12-grs <br />-------------------------------------------- <br />Conduit, 2" Fiberglass Bridge Mount (F&I) <br />LF <br />$ <br />42.25 <br />630-6-14-grs <br />-------------------------------------------- <br />Conduit, 4" Fiberglass Bridge Mount (F&I) <br />LF <br />$ <br />48.50 <br />630 -7 -TW <br />-------------------------------------------- <br />Detectable Tracer Wire (F&I) <br />LF <br />$ <br />0.40 <br />630 -7 -MT <br />-------------------------------------------- <br />Detectable Marking Tape (F&I) <br />LF <br />$ <br />0.25 <br />630 -7 -JL <br />-------------------------------------------- <br />Jet Line (F&I) <br />LF <br />$ <br />0.20 <br />630 -7 -ROW <br />-------------------------------------------- <br />ROW Delineator Marker Post Orange 6' (F&I) <br />EA <br />$ <br />64.50 <br />Pull Boxes and Junction Boxes <br />Per <br />Unit Price <br />635-8-444 <br />Manhole, Concrete 4'x4'x4' Steel Lid (F&I) <br />EA <br />$ 3,200.00 <br />635-8-232 <br />Handhole, Composite 24"x36"x24" W/ Lid (F&I) <br />EA <br />$* <br />900.00 <br />635-8-232TR <br />Handhole, Composite 24"x36"x24" W/ Lid Traffic Rated (F&I) <br />EA <br />$* <br />950.00 <br />635-8-121 <br />Pullboxes, Composite 17"x30"x12" W/ Lid (F&I) <br />EA <br />$7750.00 <br />635-8-121TR <br />Pullboxes, Composite 17"x30"x12" W/ Lid Traffic Rated (F&I) <br />EA <br />$* <br />800.00 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.