My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/11/2022
CBCC
>
Meetings
>
2020's
>
2022
>
10/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 10:51:24 AM
Creation date
12/12/2022 10:22:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/11/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCNA2018 WORK ORDER 13 <br />Bowman Consulting Group, LTD. <br />West Wabasso Septic to Sewer Phase 3A (611t Drive) <br />of the subject properties and obtain an environmental resource permit (ERP) from the St. Johns River Water <br />Management District (SJRWMD). <br />Task 4 — Bid Documents and Bidding Assistance <br />Bowman shall revise the "West Wabasso Septic to Sewer Phase 3B" bid documents to be specific to the Phase <br />3A (61St Drive) project. This task shall include attendance of the pre-bid and bid opening, assistance addressing <br />requests for information (RFI's) during the bid process, and a recommendation of bid award. <br />SERVICES NOT INCLUDED <br />• Boundary Survey of 8685 615L Drive (Lift Station Site) <br />• Construction Observation & Certification <br />EXHIBIT B — FEE SCHEDULE <br />Bowman will provide the services described above for the following lump sum fees: <br />Task 1— Engineering Design & Survey $21,500.00 <br />Task 2 — Permitting <br />$ 5,250.00 (inc. Application Fees) <br />Task 3 — Environmental Resource Permitting $ 8,000.00 <br />Task 4 — Bid Documents and Bidding Assistance $ 4,500.00 <br />Total: $ 39,250.00 <br />Services will be invoiced monthly. Lump sum invoices will reflect the percentage of the task completed. <br />EXHIBIT C — TIME SCHEDULE <br />This Task Order shall commence upon Notice to Proceed with the work to be completed as follows: <br />Task 1— Engineering Design & Survey 60 Days <br />Task 2 — Permitting 60 Days following Task 1 <br />Task 3 — Environmental Resource Permitting 60 Days Concurrent with Task 2 <br />Task 4 — Bid Documents and Bidding Assistance 30 Days following Tasks 2 & 3 <br />Total: 150 Days <br />140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.