My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-246
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 11:19:33 AM
Creation date
12/20/2022 11:09:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/22/2022
Control Number
2022-246
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 18 for Segment 3, Cell 3 Site Preparations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 10, 2022 <br />Peavey & Associates <br />Surveying & Mapping, PA <br />9399 North Lake Buffum Road Fort Meade, FI 33841 <br />Phone: 863-738-4960 <br />Email: DebPeavevaa,ueaveysurvevins.com <br />Mr. Kwasi Badu-Tweneboah, Ph. D. P.E. <br />Geosyntec Consultants <br />1200 Riverplace Boulevard, Suite 710 <br />Jacksonville, Florida 32207 <br />RE: Indian River County Vero Beach <br />Landfill Cells 3&4 Construction <br />I am pleased to offer the following proposal for surveying services at the above referenced <br />project location. <br />1. SCOPE OF SERVICES <br />The project consists of the following surveying services located at the above location as <br />follows: <br />PHASE 1 -Site Preparation Surveying <br />• Task One: Establish additional site control with references for contractor as specified <br />in bid specifications to use during construction. Pre-topo of the construction limits. <br />After stripping and dewatering. <br />• Task Two: Construction staking at 50' grid within the cell area. "These fees are for <br />one time staking* <br />• Task Three- Survey of the grades for measurement and payment purposes for a total <br />of 3 months. (There maybe additional work to include hourly rate of survey crew). <br />• Task Four- Stakeout locations of groundwater monitoring wells and gas monitoring <br />probes. <br />• Task Five- Survey TOC (northing, easting, and elevation in NGVD29) for individual <br />wells. Survey shall be prepared in accordance with the FDEP permit. Providing three <br />(3) signed and sealed hard copies and electronic file. <br />11- Cell Construction Surveying NOT PART OF <br />• Task s -built survey of the prep THIS WORK =Panels, <br />or <br />trench. ORDER <br />• Task Two: As -built survey seco s, <br />destructs. <br />• Task Three: As -built survey of the ary lineree�t�l mbrane. Panels, repairs, <br />destructs, and liner tie -i <br />• Task Four: As- survey of the 2' protective layer surface. <br />Peavey & Associates Page 1 Surveying & Mapping, PA <br />
The URL can be used to link to this page
Your browser does not support the video tag.