My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-246
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 11:19:33 AM
Creation date
12/20/2022 11:09:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/22/2022
Control Number
2022-246
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 18 for Segment 3, Cell 3 Site Preparations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />BUDGET ESTIMATE <br />PHASE 1 - SITE PREPARATION FOR CELL 3 CONSTRUCTION <br />CLASS I LANDFILL - SEGMENT 3 EXPANSION <br />INDIAN RIVER COUNTY, FLORIDA <br />PHASE 2: PREPARATION OF CONSTRUCTION DOCUMENTS <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />COST <br />A. Professional Services <br />a. <br />Senior Principal <br />Hr <br />$260.00 <br />16 <br />$4,160.00 <br />b. <br />Principal <br />Hr <br />$245.00 <br />0 <br />$0.00 <br />c. <br />Senior Professional <br />Hr <br />$225.00 <br />16 <br />$3,600.00 <br />d. <br />Project Professional <br />Hr <br />$203.00 <br />0 <br />$0.00 <br />e. <br />Professional <br />Hr <br />$176.00 <br />42 <br />$7,392.00 <br />f. <br />Senior Staff Professional <br />Hr <br />$154.00 <br />30 <br />$4,620.00 <br />g. <br />Staff Professional <br />Hr <br />$132.00 <br />0 <br />$0.00 <br />Subtotal Professional <br />$19,772.00 <br />B. Technical/Administrative Services <br />a. <br />Senior Designer <br />Hr <br />$119.39 <br />76 <br />$9,073.64 <br />b. <br />Designer <br />Hr <br />$117.10 <br />0 <br />$0.00 <br />c. <br />Senior Drafter/Senior CADD Operator <br />Hr <br />$81.39 <br />0 <br />$0.00 <br />d. <br />Project Administrator <br />Hr <br />$83.08 <br />0 <br />$0.00 <br />e. <br />Clerical <br />Hr <br />$49.96 <br />0 <br />$0.00 <br />Subtotal Tech nical/Adminis <br />$9,073.64 <br />C. Reimbursables <br />a. <br />Lodging <br />Da <br />$100.00 <br />0 <br />$0.00 <br />b. <br />Per Diem <br />Da <br />$55.00 <br />0 <br />$0.00 <br />c. <br />Communications Fee <br />3% Labor <br />$0.03 <br />$28,846 <br />$865.38 <br />d. <br />CADD Computer System <br />Hr <br />$15.00 <br />76 <br />$1,140.00 <br />e. Vehicle Rental & Fuel <br />Da <br />$150.00 <br />0 <br />$0.00 <br />f. <br />8"x11" Photocopies <br />Each <br />$0.12 <br />400 <br />$48.00 <br />g. <br />CADD Drawings <br />Each <br />$3.00 <br />200 <br />$600.00 <br />Subtotal Reimbur <br />$2,653.38 <br />TOTAL ESTIMATED BUDGET: PHASE 02 <br />$31,499.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.