My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-255
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 2:21:39 PM
Creation date
12/20/2022 12:44:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Memorandum of Understanding
Approved Date
12/13/2022
Control Number
2022-255
Agenda Item Number
8.O.
Entity Name
Bridge MP Partners, LLC
Subject
Memorandum of Understanding for former Bristol Bay Site
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Upon County approval of the surveys and detailed plans and location of the New <br />Easements, the County agrees to allow Bridge and its contractors to perform construction <br />work in the Existing Easements listed in the Declaration of Easements, recorded in Official <br />Records Book 2016, Page 1957, Public Records of Indian River County, Florida, as <br />amended by the Partial Release of Declaration of Easements, recorded in Oficial Records <br />Book 2595, Page 1632, Public Records of Indian River County, Florida. <br />4. The County agrees to release, vacate, terminate, and discharge from the Property, in the <br />Public Records of Indian River County, Florida, the Existing Easements reserved by the <br />County in that certain Resolution No. 2006-165, recorded in Official Records Book 2099, <br />Page 1593; and the Declaration of Easements recorded in Book 2016, Page 1957, as <br />amended by that Partial Release of Declaration of Easements recorded in Book 2595, Page <br />1632, Public Records of Indian River County, Florida, upon the occurrence of the following <br />conditions precedent: <br />5. All New Easements (storm sewer piping/conveyance systems and associated structures, <br />potable water, sewer and reuse water lines) have been installed inspected, tested, cleared <br />by the FDEP, and accepted by the County through a bill of sale and approved for use, in <br />accordance with approved plans by the applicable County utility and public works <br />authorities together with the necessary easements covering the new utility lines and <br />stormwater conveyance structure. <br />6. Once the conditions precedent listed above are satisfied with respect to any of Paragraph 4 <br />above, whether individually or collectively, the County agrees to execute and record a <br />separate release, vacation and/or termination as to the Existing Easement referenced in the <br />above for which such conditions precedent have been satisfied. <br />7. This Memorandum of Understanding may only be modified in writing by the mutual <br />agreement of both parties hereto. <br />8. Following execution by both the County and Bridge, this MOU may be recorded by Bridge <br />against the Property in the Public Records of Indian River County, Florida. <br />Signature Page to Follow <br />
The URL can be used to link to this page
Your browser does not support the video tag.